My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-025 - Final Environmental Impact Report No. 2004-02
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2009
>
2009-025 - Final Environmental Impact Report No. 2004-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:26:00 PM
Creation date
6/18/2009 12:28:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2009-025
Date
5/18/2009
Destruction Year
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reduction in Water Demand <br /> Square Feet (SF) Demand Demand <br />Land Use IUnits (du) Coefficient (gallonslday) <br />Cinema Site Commercial 10,000 SF 60 glksf/d 600 <br />(Cinema Lofts) <br />Cinema Site Residential 15du 275 gldldu 4,125 <br />(Cinema Lofts) <br />Restaurant 8,590 SF 220 g/ksfld 1,890 <br />Retail <br />Total <br />5,291 SF 220glksfld 1,164 <br />__ -- 7,779 <br />The project proposes to add a 185-room hotel. As detailed in the Amended Domestic Water <br />Technical Report for MacArthur Place the Doubletree hotel had a demand coefficient of 180 g/d/rm. <br />This same demand coefficient was used to calculate the proposed hotel's water demand, as detailed <br />in the table below. <br />Water Demand of Proposed Hotel <br />Demand Demand <br />Land Use Rooms Coefficient (gallonslday) <br />Proposed Hotel 185 180 gld/rm 33,300 <br />Updated Water Demand <br />Increase in Water Demand <br />from the Proposed Project <br />Water Demand Gallons per Day (gallons per day) <br />Previous water demand (per EIR) 354,535 <br />Reduction in water demand from -7,779 380,056 <br />removed project components -354.535 <br />Additional water demand from +33,300 25,521 <br />185-room hotel <br />Total updated water demand 380,056 <br />As detailed in the table above, the reduction in water demand from the removed project components <br />plus the additional water demand from the proposed hotel result in an updated water demand of <br />380,056 gallons per day. The proposed project will increase the water demand by 25,521 gallons per <br />day compared to the previous project. The updated water demand of 380,056 gallons per day converts <br />to 426 acre feet per year, which is an increase of 29 acre feet per year compared to the previous project. <br />As detailed in correspondence with the City of Santa Ana Planning Division and Public Works <br />Agency, more than adequate water and sewer infrastructures, and services and laterals, have been <br />constructed at the proposed hotel project frontage that can meet the project's water and sewer needs. A <br />Sewer Study will not be necessary. Four 1-inch water meters, one 2-inch water meter, and a 6-inch <br />sewer lateral are available at the project's frontage in MacArthur Boulevard. A 6-inch water vault and <br />meter and an 8-inch fire service are also available. Additionally, as detailed in the EIR, at 2020, the <br />City's overall water production would be 55,370 acre feet per year. Between 2010 and 2020 the City's <br />water production would increase by 2,410 acre-feet per year. The increased amount of water <br />production between 2006 and 2020 would accommodate the increased water demand generated by the <br />Resolution No. 2009-025 <br />MacMl~leb®~outh <br />EIR Addendum 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.