My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - FIRE ALARM SYSTEMS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
07/06/2009
>
25E - FIRE ALARM SYSTEMS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:18:15 PM
Creation date
7/1/2009 2:53:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25E
Date
7/6/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VII. QUANITITY VERIFICATION <br />It is the sole responsibility of the contractor to verify the models and quantities of the fire system <br />installed. The information provided in the attachment by the City is just a guideline. <br />VIII. NOTIFICATION AND SCHEDULING <br />Prior to initiating any testing and inspection or repair of any of the fire systems, the proper <br />scheduling and notification of the Facilities Maintenance Superintendent or his designee, the <br />appropriate monitoring station, and the Fire Department must be notified. <br />IX. SYSTEM RESTORATION <br />After completion of the work, at the end of each working day, the fire system must be restored to <br />their full operation and the Facilities Maintenance Superintendent and/or his designee, the <br />appropriate monitoring station, and the Fire Department shall be notified. <br />Rev: 3/27/2009 <br />25E-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.