My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22C - ASPHALT ST MAINT AND POTHOLE REPAIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
07/06/2009
>
22C - ASPHALT ST MAINT AND POTHOLE REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:18:09 PM
Creation date
7/2/2009 10:01:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
22C
Date
7/6/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />JULY 6, 2009 <br />TITLE: <br />CONTRACT RENEWALS FOR ASPHALT <br />STREET MAINTENANCE AND ASPHALT <br />POTHOLE REPAIR <br />(SPEC. NOS. 06-101 AND 06-103) <br />~~~~~ <br />/ CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 15' Reading <br />^ Ordinance on 2"d Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />1. Renew the contract with Hardy and Harper, Inc., for asphalt pothole <br />repairs for a one-year period in the annual amount not to exceed <br />$~oo,ooo. <br />2. Renew the contract with Hardy and Harper, Inc., for asphalt street <br />maintenance for a one-year period in the annual amount not to exceed <br />$580,000. <br />DISCUSSION <br />The Public Works Agency's Street Division is responsible for maintaining <br />approximately 400 miles of streets within the City of Santa Ana. In order <br />to do so, annual asphalt street maintenance and pothole repairs are <br />required. <br />Over the past several years, the City has realized good response and <br />service from the contractor as well as flexibility of service levels. As <br />needs change, the contractor has the ability to increase or decrease <br />resources without affecting City staff or other programs. Through this <br />contract the City's roadway maintenance budget has seen a reduction of 18 <br />percent in unit costs for work performed. Staff that was previously <br />assigned to roadway maintenance has been reassigned to other maintenance <br />programs such as graffiti removal, trees and roadway cleaning. <br />Services provided under the asphalt street maintenance contract include the <br />excavation and cold milling of existing roadways, the installation of <br />pavement reinforcement fabric, construction of asphalt concrete pavement, <br />and crack sealing. In addition, the contract provides for water and sewer <br />system maintenance, including trench repair and the adjustment of water <br />valve boxes and manhole frames and covers to grade. <br />22C-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.