My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-07-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
07/06/2009
>
FULL PACKET_2009-07-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:18:08 PM
Creation date
7/2/2009 2:12:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
7/6/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Renewal for Street Maintenance and Pothole Repair <br />July 6, 2009 <br />Page 2 <br />Services provided under the pothole repair contract <br />all potholes and the repair of all damaged pavement <br />sq. ft. in area with asphalt overlay. Since August <br />asphalt concrete has been used to fill approximat <br />small damaged pavement areas. Hardy & Harper, Inc. <br />timely manner with all requests for pothole repair, <br />street overlays. <br />include the repair of <br />areas not exceeding 50 <br />2006, over 2400 tons of <br />ely 80,000 potholes and <br />has responded in a <br />trench repair and <br />On August 7, 2006, the City Council awarded contracts to Hardy and Harper, <br />Inc., a Santa Ana vendor, for a one-year period with provision for three, <br />one-year renewals for asphalt street maintenance and pothole repair. The <br />vendor has performed satisfactorily during the past contract period and has <br />agreed to renew the contracts without an increase in pricing. Staff <br />recommends the final renewal of the contracts. <br />FISCAL IMPACT <br />Funds are available in the Public Works Road Maintenance, the Sanitary <br />Sewer Service, Water Utility Water System Maintenance, and the Roadway <br />Maintenance accounts (nos. 29-631-6291, 056-575-6291, 064-575-6291 and 29- <br />631-6291). <br />APPROVED AS TO FUNDS & ACCOUNTS: <br />L <br />Ja es G. Ross Francisco Gutierrez <br />E ecutive Director Executive Director <br />ublic Works Agency Finance and Mgmt. Services Agency <br />JGR/WO/06-1O1.R3.9 & 06-103.R3.9: <br />22C-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.