My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-07-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
07/06/2009
>
FULL PACKET_2009-07-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:18:08 PM
Creation date
7/2/2009 2:12:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
7/6/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />JULY 6, 2009 <br />TITLE: <br />CONTRACT RENEWAL FOR <br />SIDEWALK MAINTENANCE <br />(SPEC. NO. 06-102) <br />f ~ '` <br />ITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 15f Reading <br />^ Ordinance on 2"d Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />Renew the contract with Channel Islands Sawing for sidewalk maintenance for <br />a one-year period in the annual amount not to exceed $150,000. <br />DISCUSSION <br />The Public Works Agency's (PWA) Maintenance Services Division is responsible <br />for maintaining the sidewalks of Santa Ana. PWA evaluates the condition of <br />the sidewalks and identifies uneven surfaces, cracks and holes that need <br />repairing. Once identified, the repair work is contracted. The recommended <br />contract provides for offset grinding to repair uneven surfaces caused by <br />underlying tree roots that raise sidewalk areas, resulting in risks to <br />pedestrian traffic. During the previous contract term, 3,600 sidewalk areas <br />were repaired using offset grinding. A separate contract is used to repair <br />cracks and holes in sidewalks. <br />On August 7, 2006, the City Council awarded a contract to Channel Islands <br />Sawing for a one-year period with provision for three, one-year renewals. <br />The vendor has performed satisfactorily during the past contract period and <br />has agreed to renew the contract without an increase in pricing. Staff <br />recommends the final renewal of the contract. <br />FISCAL IMPACT <br />Funds are available in the Public Works Road Maintenance account (no. 29- <br />631-6291). <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br /> <br />James G. ss ~ ~iC.Francisco Gutierrez r~ <br />Executiv Director Executive Director r <br />Public orks Agency Finance & Mgmt. Services Agency <br />JGR/WO/06-102.R3.9: 2 2 ~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.