My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-034 (2) - Final Supplemental Environmental Impact Report for Fairhaven/Lincoln
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2009
>
2009-034 (2) - Final Supplemental Environmental Impact Report for Fairhaven/Lincoln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2015 1:21:03 PM
Creation date
7/20/2009 5:23:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2009-034
Date
7/6/2009
Destruction Year
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Pao 'ect Description <br />Fairhaven /Lincoln Intersection <br />• Reconfigure Fairhaven Avenue to terminate as a ui -de -sac east of the railroad tracks. The cu 1-de- <br />sac would include emergency access driveways. <br />• Close Lincoln Avenue bet wreen Fairhaven Avenue and Park Lane. Install a swing gate 'ust north of <br />Park Lane to prohibit vehicles on the northernmost ortion of Li p n Avenue. The gate would allow <br />emergency vehicle access. <br />• Install "right turn only°' signs and pavement markings on Parr Lane at Lincoln Avenue, <br />• Maintained two-way traffic on Lincoln Avenue from Parr Larne to Santa Clara Avenue. <br />Santa Clara /Lincoln Intersection <br />• Install a traffic signal at the Santa Clara Avenue and Lincoln Avenue intersection. <br />• Relocate utilities as necessary (minor) to facilitate signal operations. <br />* Install new warning signals and signage on Santa Clara Avenue east of the track to prevent traffic <br />queuing onto or near the tracks and to prevent vehicles from getting trapped between the railroad <br />crossing gates. Westbound traffic on Santa Clara Avenue would stop before crossing the tracks. <br />• Partial take of land is required from the residential property located at the southwest corner of the <br />intersection to regrade and raise the surface of the roadway. <br />• Relocate the driveway at the southwest corner property from Lincoln Avenue to Santa Clara Avenue. <br />• Install new landscape at the corner property. <br />Construction activities would occur between 7:00 AM and 8:00 PM, Monday through Friday, with some <br />nighttime and weekend work up to two vwreekends). The construction period for the Fa`nrhaven and Santa <br />Clara crossings at Lincoln world be 6 weeks each for a total construction time of 12 creeks. <br />INTENDED USES OF THE EIR <br />This document is a Draft SuPplement to are E IR, which exam i nes tine environmental i impacts of the proposed <br />revisions to the original 2002 project. It is the intent of this Draft SEIR to enable the City of Santa Ana, other <br />responsible agerncies, and interested parties to evaluate the environmental impacts of the proposed project; <br />thereby enabling there to make informed decisions about the project. The anticipated approvals required for <br />this project are as follows: <br />,dead Agency <br />Chy of Santa Ana <br />Responsible Agencies <br />California Public Utilities Commission <br />South Coast Air Quality Management District <br />Action <br />Certification of the Supplement to an Environmental Impact Report <br />otio► <br />Grade Crossings General Order -5. Rules for Altering Public Highway - <br />Rail Crossings <br />Air Quality Permit for Construct on <br />Southern California Regional Rail Authority (S RRA ) Project Funding <br />Orange County Transportation Authority (TA) Project Funding <br />1?0 <br />EfairhavenlLincoln rind Santa ClaralLincoln Intersection Modifications City of Santa Ana a Page -. <br />Suplement to the Santa Ana Second Main Track Project EIR Resolution No. 2009 -034 <br />Page 29 of 130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.