My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PICO LOWELL NEIGHBORHOOD WATER MAIN IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
08/03/2009
>
23B - PICO LOWELL NEIGHBORHOOD WATER MAIN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:17:24 PM
Creation date
7/28/2009 11:58:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23B
Date
8/3/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Award For Pico <br />Lowell Water Main Improvements <br />August 3, 2009 <br />Page 2 <br />NAME OF RESPONSIVE BIDDER <br />1. MCC Equipment Rentals, Inc. <br />2. Dominguez General Engineering <br />3. VCI Construction <br />4. General Underground Fire Protection <br />5. John T. Malloy, Inc. <br />6. MNR Construction <br />7. Sully Miller Contracting Co. <br />8. J. DeSigio Construction <br />9. Garcia Juarez Construction, Inc. <br />10. Excel Paving Co. <br />11. Delta Pipeline <br />12. A. R. Sarmiento, Inc. <br />13. Kana Pipeline, Inc. <br />14. Tiffany Group, Inc. <br />15. Savala Construction Co. <br />CITY BID AMOUNT <br />Beaumont $644,097.50 <br />Rosemead $728,015.00 <br />Upland $799,634.59 <br />Anaheim $864,758.00 <br />Los Angeles $882,775.00 <br />San Dimas $940,775.00 <br />Anaheim $949,400.00 <br />Arcadia $950,075.00 <br />Brea $963,770.00 <br />Long Beach $986,390.00 <br />La Verne $995,339.29 <br />La Habra $1,024,103.00 <br />Placentia $1,096,335.00 <br />Tarzana $1,132,110.00 <br />Irvine $1,483,088.85 <br />A total of fifteen bids were received and all were responsive. The lowest <br />bid was submitted by MCC Equipment Rentals, Inc., for $644,097.50, which <br />is below the Engineer's estimate of $1,118,625. <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the <br />recommended action is exempt from further review. Categorical Exemption, <br />ER #2008-96 has been filed. <br />FISCAL IMPACT <br />The funding analysis shows a total estimated construction cost of <br />$805,100 for the project (Exhibit 2.) Funds are available in the Water <br />Utility Capital Projects Fund (account no. 66-579-6635). <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br />a' Y <br />James G. Ross <br />Executive Director <br />Public Works Agency <br />Francisco Gutierrez „p <br />Executive Director /'~ <br />Finance & Mgmt. Services Agency <br />K:\Construction\RFCA-draft\08-03-09 Pico Lowell 08-3210 160 WD .docx <br />23B-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.