Laserfiche WebLink
F. Half -size set of plans (Title Sheet, Typical Sheets, Layout Plans, Profile Plans, <br />Lane Channel Realignment Plan and Advanced Planning Studies) <br />G. Cooperative Agreement with Caltrans (Approved in February, 2007) <br />H. Initial Site Assessment (ISA) <br />I. Socioeconomic Report <br />J. Final Relocation Impact Report <br />K. Historic Property Survey Report — Negative Findings <br />In 2007, OCTA commenced the Project Study Report (PSR) for the SR -55 Widening <br />project between Interstates 405 and 5. This project consists of five alternatives and <br />the widest alternative includes one additional general purpose lane in each direction <br />compared to the SR -55 lane configuration of the approved Alton Avenue <br />Overcrossing Project. The design of Alton Avenue Overcrossing Project shall be <br />compatible with the five design alternatives of OCTA's SR -55 Widening Project. <br />For information on SR -55 PSR, please contact Dan Phu of OCTA at (714) 560 -5907. <br />If you have any further question on this RFP, please contact Kenny Nguyen at (714) <br />647 -5632. <br />III. CONTENT OF PROPOSAL <br />In order to maintain a uniformity with all proposals furnished by the Consultants, it is <br />hereby requested the proposals be limited to a maximum of 35 pages (excluding <br />front and back covers, section dividers and resumes) and include the following: <br />A. Cover letter highlighting the Prime Consultant's qualifications and the primary <br />location where the work will be performed. There shall be indication that the <br />proposal will be valid for 90 days and must be signed by an officer that has <br />authority to bind the Consultant. <br />B. Project understanding and approach discussing the project, key issues, and any <br />suggestions or special concerns that the City of Santa Ana should be made <br />aware of. <br />C. A detailed scope of work identifying each required task for the preparation of the <br />Environmental Reevaluation, GAD, and PS &E in accordance with Caltrans <br />policies and requirements, along with any additional tasks not currently identified <br />in this RFP, but are necessary for the successful completion of the project. <br />D. Project schedule, management plan and quality control measures to be <br />implemented on the project that will ensure that the required services will be <br />completed in a timely manner. The Consultants shall provide the firm's workload <br />and the ability to perform the work requested, specifically as it relates to the <br />Project Manager and key personnel. <br />IXI <br />