My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS INC 1 - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
HUITT-ZOLLARS INC 1 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 5:31:10 PM
Creation date
8/10/2009 2:32:52 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS INC
Contract #
A-2009-034
Agency
PUBLIC WORKS
Council Approval Date
4/6/2009
Insurance Exp Date
6/1/2011
Destruction Year
2020
Notes
WC: 6/1/2011; PL ex. 01/23/2011 Amended by A-2009-034-001, -002
Document Relationships
HUITT-ZOLLARS INC 1A - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
HUITT-ZOLLARS, INC. 1B - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Preliminary Engineering <br />This task includes preparing and obtaining the approval for the Advanced <br />Planning Study (APS) of the overcrossing bridge and the GAD of the <br />preferred alternative (Exhibit B) in accordance with Caltrans plan <br />preparation criteria for GAD. The proposed improvements as shown in <br />Exhibit B were designed and drawn in metric units. The Consultant shall <br />be responsible for modifying the final configuration to accommodate the <br />alternatives of OCTA's SR -55 Widening Project in US Customary English <br />units. GAD includes conceptual grading for the establishment of <br />preliminary right -of -way limits. The Consultant shall complete the Caltrans <br />design checklist (DIB 78) and be responsible for the preparation and <br />approval of any supplemental mandatory and /or advisory fact sheets from <br />Caltrans of all additional non - standard design elements during this <br />preliminary phase. Plan drawings shall be prepared on strip maps in a <br />sufficient scale to show design features, typically 1 ":50' or 1 ":100' (Refer to <br />Caltrans Guidelines for GAD Submittal Guidelines). The GAD <br />development shall include two (2) milestone deliverables —Draft GAD and <br />Final GAD. At each milestone, eight (8) copies of the GAD, checklist, and <br />fact sheet shall be delivered to the Cities of Santa Ana and Irvine, along <br />with requisite number of copies required by Caltrans District 12. The <br />electronic files shall be submitted upon the approval of GAD. <br />F. PS &E Preparation <br />Upon receiving the approval of the GAD and the APS from the City of <br />Santa Ana, City of Irvine, and Caltrans, the Consultant shall prepare the <br />necessary PS &E documents ready for bidding for each design option <br />separately. The design within the Caltrans right -of -way shall follow all <br />applicable Caltrans standards. Design within the City of Santa Ana or <br />Irvine limits shall follow their respective design standards. <br />The following shall be included: <br />Survey and Mapping – Design level survey and base mapping of the <br />project site shall be prepared in US Customary English units by a <br />California licensed Land Surveyor in accordance with Caltrans Surveys <br />Manual and in Microstation V8 format. The horizontal datum shall be <br />NAD 83 and the vertical datum shall be NAVD 88. The Consultant <br />shall be responsible for the following, but not limited to: <br />a. Obtain survey control of Caltrans and the Cities of Santa Ana <br />and Irvine. <br />b. Recover, tie and verify existing survey control to adjacent <br />monument and benchmark controls. <br />C. Provide additional secondary horizontal and vertical control for <br />design surveys. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.