My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS INC 1 - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
HUITT-ZOLLARS INC 1 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 5:31:10 PM
Creation date
8/10/2009 2:32:52 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS INC
Contract #
A-2009-034
Agency
PUBLIC WORKS
Council Approval Date
4/6/2009
Insurance Exp Date
6/1/2011
Destruction Year
2020
Notes
WC: 6/1/2011; PL ex. 01/23/2011 Amended by A-2009-034-001, -002
Document Relationships
HUITT-ZOLLARS INC 1A - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
HUITT-ZOLLARS, INC. 1B - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
attendees and invitees. The Consultant shall identify any additional <br />meetings as they deem necessary. <br />3. Progress Reporting - Progress reports shall be submitted at monthly <br />intervals, indicating progress achieved during the reporting period in <br />relation to the progress scheduled. The Consultant shall provide the <br />City with two (2) copies of the progress report at least four (4) working <br />days before the PDT. <br />4. Project Schedule — The Consultant shall prepare the project schedule <br />in Microsoft Project format utilizing the Caltrans Work Breakdown <br />Structure (WBS). The project schedule shall be updated on a regular <br />basis and distributed at the PDT meetings. The project schedule <br />should break the tasks and subtasks into WBS Level 7 details. <br />B. Permits <br />The Consultant shall be responsible for securing Caltrans encroachment <br />permit for all field studies, such as surveying and geotechnical activities. <br />The Consultant shall be responsible for securing any additional required <br />permit from other agencies. <br />C. Research & Data Collection <br />The Consultant shall research and collect information related to the project <br />site, including existing field conditions, as -built plans and record drawings, <br />agreements, right -of -way data, and all future improvement plans adjacent <br />to or affecting the project site to accurately layout all underground <br />improvements, easements, station lines, right -of -way limits and private <br />property lines. The Consultant shall be responsible for the coordination <br />with utilities agencies to obtain all necessary existing and proposed <br />facilities within the affected areas. The Consultant shall coordinate with <br />OCTA for the compatibility between this project and the SR -55 Widening <br />Project. <br />D. Environmental <br />The Consultant shall be responsible for the review and determination of <br />updating the EIR /EA and PR. The Consultant shall coordinate with <br />Caltrans District 12 to determine the necessary process to update the data <br />and prepare applicable documents to ensure that the environmental <br />assessment comply with Caltrans requirements. <br />N. <br />
The URL can be used to link to this page
Your browser does not support the video tag.