My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS INC 1 - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
HUITT-ZOLLARS INC 1 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 5:31:10 PM
Creation date
8/10/2009 2:32:52 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS INC
Contract #
A-2009-034
Agency
PUBLIC WORKS
Council Approval Date
4/6/2009
Insurance Exp Date
6/1/2011
Destruction Year
2020
Notes
WC: 6/1/2011; PL ex. 01/23/2011 Amended by A-2009-034-001, -002
Document Relationships
HUITT-ZOLLARS INC 1A - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
HUITT-ZOLLARS, INC. 1B - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii. GDR presenting the project site subsurface geotechnical <br />conditions based on the exploration drilling and sampling <br />and laboratory testing, evaluating impacts of these <br />conditions, and providing recommendations for slope <br />stability, grading factors, embankments, type of earth <br />retaining systems, and culvert foundations. <br />iv. Materials Report summarizing field and laboratory <br />results, listing special considerations and /or assumptions, <br />providing recommendations for the design of pavement <br />structural sections, drainage culvert material selections, <br />and corrosiveness of new culverts. <br />v. ADL Report outlining the findings of the field <br />investigation, results of laboratory tests and statistical <br />analysis and recommendations of mitigation measures to <br />meet current Caltrans and Department of Toxic <br />Substances Control standards regarding ADL <br />contaminated soil. <br />4. Utility Coordination and Design — All impacted utility lines within the <br />project limits shall be compiled on utility base plans and forwarded to <br />each utility agency for review, correction, and certification of accuracy. <br />The Consultant shall copy the City of Santa Ana on all transmittals, <br />notifications, submittals and letters to the utility agencies. Other tasks <br />include: <br />a. Identify all utilities with prior /perceptive rights. <br />b. Prepare utilities plans and pothole plans. <br />C. Coordinate utility designs —the design of relocated facilities and <br />new designated service point connection —with utility agencies, <br />including notifying at the 60 %, 95% and final submittal <br />milestones, distributing of plans with each notification, and <br />keeping a log of all correspondence with each utility company. <br />The Consultant shall be responsible for coordinating and <br />obtaining the necessary utility designs for each submittal <br />package. <br />d. Prepare a Utility Relocation Agreement and /or Joint Use <br />Agreement for each prior right utility relocation within State R/W. <br />5. Drainage Design — The Consultant shall perform the drainage design in <br />accordance with Caltrans, County of Orange and affected local <br />agencies. The tasks include, but not limited to, the following: <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.