Laserfiche WebLink
Report (NSR) in according to Caltrans Traffic Noise Analysis <br />Protocol. The soundwall design shall follow the guidelines from <br />Caltrans Standard Detail Sheets (XS Sheets). <br />9. Plans Preparation - The plan development shall include four (4) <br />milestone deliverables -30 %, 60 %, 95% (pre - final) and 100% (final). <br />A plan set shall be prepared for each design option. Plans shall be <br />prepared in conformance with Caltrans Plans Preparation Manual. <br />The necessary plans shall include, but not be limited to: <br />a. Title Sheet <br />b. Typical Cross Sections <br />C. Key Map and Line Index <br />d. Layout <br />e. Profiles <br />f. Superelevation <br />g. Construction Details <br />h. Temporary Water Pollution Control Details & Quantities <br />i. Erosion Control Plans and Details <br />j. Contour Grading <br />k. Drainage Plans <br />I. Drainage Profiles <br />M. Drainage Details <br />n. Drainage Quantities <br />o. Utility Plans (include relocation plans or new utility facilities) <br />p. Stage Construction <br />q. Stage Construction Details <br />r. Pavement Delineation Plans <br />S. Sign Plans <br />t. Retaining Wall Plans <br />U. Soundwall Plan <br />V. Landscape Plans (disturbed areas only) <br />W. Irrigation Plans <br />X. Electrical Plans <br />y. Bridge Plans <br />15 <br />