My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS INC 1 - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
HUITT-ZOLLARS INC 1 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 5:31:10 PM
Creation date
8/10/2009 2:32:52 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS INC
Contract #
A-2009-034
Agency
PUBLIC WORKS
Council Approval Date
4/6/2009
Insurance Exp Date
6/1/2011
Destruction Year
2020
Notes
WC: 6/1/2011; PL ex. 01/23/2011 Amended by A-2009-034-001, -002
Document Relationships
HUITT-ZOLLARS INC 1A - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
HUITT-ZOLLARS, INC. 1B - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 1.0 PROJECT MANAGEMENT <br />Task 1.1 Meetings <br />Huitt - Zollars will arrange and lead up to 30 meetings with the City and Caltrans staff and other representatives from <br />resource agencies as necessary, including a kick -off meeting, PDT meetings and any other technical meetings. <br />Minutes will be prepared by Huitt- Zollars. Huitt - Zollars will prepare an Action Item list and a Deliverables Status <br />Matrix for each meeting. The purpose of the kick -off meeting will be to discuss the project scope and schedule, to <br />establish formal lines of communication, and to schedule the first few meeting dates and subjects. PDT meetings <br />will discuss project progress, issues and action items. Technical meetings will be focused on specific technical <br />issues. <br />Task 1.2 Monthly Progress Report, Schedule, and Invoice <br />Huitt - Zollars will prepare up to 30 monthly progress reports as supporting data for invoices presented monthly to <br />the City. The Progress Report will include accomplished tasks for the month, anticipated progress for the next <br />month, pending issues and schedule completion target dates. Within 2 weeks of Notice to Proceed (NTP), Huitt- <br />Zollars will provide to the City and Caltrans a detailed project baseline schedule, indicating milestones, major <br />activities and deliverables, for review and comments. Huitt - Zollars will update the schedule on a monthly basis or <br />as requested. Huitt - Zollars will prepare monthly reports of expenditures for the project by task and milestone as <br />supporting data for invoices. Expenditures include direct labor costs, other direct costs and subconsultant costs. <br />Progress reports, the schedule, and invoices will be mailed to the City on a monthly basis. <br />Task 1.3 Quality Control <br />Huitt- Zollars will have a quality control plan in effect during the entire course of the project. Huitt - Zollars will <br />develop a plan establishing a process to ensure design calculations are independently checked. Exhibits and <br />plans will also be checked, corrected and back - checked for accuracy and completeness. Huitt - Zollars will review <br />environmental and engineering subconsultant report submittals to ensure that appropriate background information, <br />study methodology, interpretation of data, format and content are completed in accordance with current standards. <br />Engineer will adhere to Caltrans District 12 QA/QC guidelines. <br />Task 1.4 Project Files <br />Project Files will be maintained by Huitt - Zollars for the duration of the project. Final approved documents will be <br />provided to the City in hard copy and on CD or DVD. <br />Task 1.5 Permits <br />Huitt- Zollars will prepare necessary encroachment permits applications and rights of entry. <br />TASK 2.0 TRAFFIC REPORT <br />Task 2.1 Study Orientation <br />The Huitt - Zollars Team will obtain available background documents related to this project. <br />Task 2.2 Study Scope Refinement <br />In coordination with the project team (including City of Santa Ana, City of Tustin, and City of Irvine), the study area <br />will be refined. A scope letter will be provided to include following discussions: <br />• Traffic Analysis Methodology <br />• Analyze up to 16 arterial intersections and ramp intersections within the study area of Main Street to the west, <br />Red Hill Avenue to the east, Dyer Road to the north and MacArthur Boulevard to the south. <br />• Use traffic signal warrant study methodology to identify future new intersection signalizations. <br />• Analyze freeway weaving and ramp operation conditions between the two existing interchanges plus the new <br />ramps. <br />• Obtain OCTA updated OCTAM 3.3 model for long range traffic volume forecasting <br />