My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS INC 1 - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
HUITT-ZOLLARS INC 1 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 5:31:10 PM
Creation date
8/10/2009 2:32:52 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS INC
Contract #
A-2009-034
Agency
PUBLIC WORKS
Council Approval Date
4/6/2009
Insurance Exp Date
6/1/2011
Destruction Year
2020
Notes
WC: 6/1/2011; PL ex. 01/23/2011 Amended by A-2009-034-001, -002
Document Relationships
HUITT-ZOLLARS INC 1A - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
HUITT-ZOLLARS, INC. 1B - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5.4 Profile /Superelevation Diagrams <br />Huitt - Zollars will refine the Project Report profiles and superelevation diagrams, for freeway, ramp and arterial road <br />improvements that include original ground, profile grade information and superelevation data. <br />Task 5.5 Design Information Bulletin (DIB) 78 -02 Checklist <br />Huitt - Zollars will complete the DIB 78 -02 Checklist. <br />Task 5.6 DIB 82 -03 Pedestrian Accessibility Guidelines for Highway Projects <br />Huitt - Zollars will ensure that the design is completed in compliance with DIB 82 -03. <br />Task 5.7 Truck Turning Templates <br />Huitt- Zollars will prepare truck turning template exhibits to verify that larger STAA and California vehicles properly <br />traverse the proposed intersections. <br />Task 5.8 Design Speed Sight Distance Analysis <br />Huitt - Zollars will prepare Sight Distance Exhibits for bridge barrier and intersection sight distance locations. <br />Plans, Specifications and Estimates <br />TASK 6.0 30% ROADWAY PS &E <br />Once GAD is approved by the City and Caltrans, Huitt - Zollars will develop plans to 30% Caltrans standards for <br />PS &E. The plan sheets will include: <br />Task 6.1 Title Sheet <br />Huitt - Zollars will prepare a title sheet that includes an index of sheets, the project description, location map, <br />structures list, begin /end work, begin /end construction, and limits of work. <br />Task 6.2 Typical Cross - Section Sheets <br />Huitt - Zollars will prepare typical section sheets for freeway lanes, ramps and arterial road improvements that <br />include original ground, traveled way, shoulders, cut/fill slopes, retaining and sound walls, existing /proposed right <br />of way and existing /recommended structural sections. <br />Task 6.3 Key Map /Line Index Sheet <br />Huitt - Zollars will prepare a key map /line index sheet that includes a location outline of plan view sheets. A <br />summary table defining the location of each roadway sheet will be prepared. Horizontal alignments will be <br />identified and annotated with the "Line" name. <br />Task 6.4 Layout Sheets <br />Huitt - Zollars will prepare base geometrics and layout sheets that include centerline and curb geometric data <br />required to construct the project. Geometric curve data will be organized in a data table. The ultimate Striping <br />Plan will be superimposed on Layout Plan to depict lane configurations. A legend and abbreviations list will be <br />prepared along with a "location of sheet" diagram for ease of layout understanding. The limits of pavement <br />removal and replacement, as well as pavement overlay limits, will be defined on the layout sheets. <br />Task 6.5 Profile /Superelevation Sheets <br />Huitt - Zollars will prepare profile and superelevation sheets for street, freeway and ramp improvements that include <br />original ground, profile grade information and superelevation data. Profiles (not superelevation diagrams) will be <br />provided for new curb adjacent sections of pavement widening. <br />Task 6.6 Design Cross - Sections <br />Design cross - sections will be provided at 100 -foot intervals. <br />Task 6.7 Right -of -Way Requirements Exhibit <br />Huitt - Zollars will prepare a Right -of -Way requirements exhibit based on the right of way requirements for the 30% <br />PS &E Project. The Right -of -Way requirement exhibit will define existing property limits, property acquisition, <br />Temporary Construction Easements (TCE), roadway easements, and any necessary utility easement areas for the <br />
The URL can be used to link to this page
Your browser does not support the video tag.