My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS INC 1 - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
HUITT-ZOLLARS INC 1 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 5:31:10 PM
Creation date
8/10/2009 2:32:52 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS INC
Contract #
A-2009-034
Agency
PUBLIC WORKS
Council Approval Date
4/6/2009
Insurance Exp Date
6/1/2011
Destruction Year
2020
Notes
WC: 6/1/2011; PL ex. 01/23/2011 Amended by A-2009-034-001, -002
Document Relationships
HUITT-ZOLLARS INC 1A - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
HUITT-ZOLLARS, INC. 1B - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 affected parcels. Based on the approved Project Report, there is no right -of -way acquisition necessary for <br />Caltrans anticipated at this time. <br />Task 6.8 Right -of -Way Acquisitions Plats and Legal Descriptions <br />Huitt - Zollars will prepare Right -of -Way acquisition plats and legal descriptions for Right of Way acquisition and /or <br />Temporary Construction Easements, as required, based on the information shown in the Right -of -Way <br />Requirements exhibit. Huitt - Zollars will prepare legal descriptions and plats for property acquisition and /or <br />easements for the 4 properties within the project area. <br />TASK 7.0 60% and 95% ROADWAY PS &E <br />Task 7.1 Roadway 60% PS &E <br />Huitt - Zollars will complete roadway, drainage, traffic, miscellaneous plans, special provisions, the engineer's <br />estimate and a draft drainage report for review by the City and Caltrans at the 60 % completion stage. The title <br />sheet for specifications and reports, and each sheet of plans, will bear the professional seal, certificate number, <br />registration classification, and expiration date of the certificate of the professional engineer responsible for their <br />preparation. Huitt- Zollars will prepare the following sheets: <br />Task 7.1.1 Title Sheet <br />Task 7.1.2 Typical Cross - section Sheets <br />Task 7.1.3 Key Map /Line Index Sheet <br />Task 7.1.4 Layout Sheets <br />Task 7.1.5 Profile /Superelevation Sheets <br />Task 7.1.6 Construction Detail Sheets <br />Construction detail sheets will be prepared for ramp gores, street intersections, driveways, curb transition details, <br />irrigations crossovers, bus and maintenance vehicle pullouts, and miscellaneous details required for the project. <br />Task 7.1.7 Contour Grading Sheets <br />Huitt - Zollars will prepare contour grading sheets. Major drainage features will be shown along with cut/fill lines <br />and design contours. <br />Task 7.1.8 Roadway Quantities Summary Sheets <br />Task 7.1.9 Retaining Wall Sheets <br />Huitt - Zollars will prepare retaining wall sheets including typical sections, details and architectural treatments. <br />Task 7.1.10 Sound Wall Sheets <br />Based on the sound wall requirements identified in the Environmental Re- Validation, Huitt - Zollars will prepare <br />sound wall sheets including typical sections, details and architectural treatments. <br />Task 7.1.11 Drainage Design Sheets <br />Huitt - Zollars will prepare drainage plan, profile, details and quantity sheets. <br />Task 7.1.12 Temporary Water Pollution Control Sheets <br />Huitt- Zollars will prepare plans for temporary erosion control facilities for the project. Design of these facilities <br />will include current Best Management Practices and will conform to the City and other requirements of Caltrans <br />and the Regional Water Quality Control Board (RWQCB). <br />Task 7.1.13 Erosion Control Sheets <br />Huitt - Zollars will prepare plans for permanent erosion control facilities for the project. Design of these facilities <br />will include current Best Management Practices and will conform to the City and other requirements of Caltrans <br />and the Regional Water Quality Control Board. <br />Task 7.1.14 Utility Sheets <br />Huitt- Zollars will prepare utility sheets that will depict both existing and relocated utilities. Preliminary Utility <br />Plans will be sent to all utility companies that may have utilities in the area for confirmation of any existing or <br />proposed new utilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.