My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS INC 1 - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
HUITT-ZOLLARS INC 1 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 5:31:10 PM
Creation date
8/10/2009 2:32:52 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS INC
Contract #
A-2009-034
Agency
PUBLIC WORKS
Council Approval Date
4/6/2009
Insurance Exp Date
6/1/2011
Destruction Year
2020
Notes
WC: 6/1/2011; PL ex. 01/23/2011 Amended by A-2009-034-001, -002
Document Relationships
HUITT-ZOLLARS INC 1A - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
HUITT-ZOLLARS, INC. 1B - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
street and bridge overcrossing. The signalized intersections will include intersection safety lighting on a <br />separate circuit. The plans will conform to the requirements of Caltrans and the City. Any required lighting <br />under the Alton Avenue overcrossing will conform to the latest IES and Caltrans guidelines for roadway <br />lighting. <br />Task 7.1.20 Revised Standard Plan Sheets <br />Huitt- Zollars will include standard plan sheets required due to revisions. <br />Task 7.1.21 Roadway Special Provisions <br />Huitt - Zollars will prepare project specific Roadway Special Provisions in accordance with Caltrans' standards. <br />The Roadway Special Provisions will bear the State of California Registered Professional Engineer registration <br />seal with the signature, license number and registration certificate expiration date of the Engineer who prepared <br />the Special Provisions or the Engineer under whose direction they were prepared. A list of contract items with <br />item descriptions, item numbers, and units of pay, and item pay codes, but without quantities or estimated unit <br />costs, will be included in the Special Provisions, <br />Task 7.1.22 Roadway Engineer's Estimate <br />Huitt- Zollars will prepare an Engineer's Estimate of construction costs, based on detailed quantity takeoffs and <br />current unit prices. A reasonable upward adjustment will be applied to bid quantities that may vary during <br />construction to allow for necessary design adjustments. The final estimate format will be the standard Caltrans <br />estimating system. Quantities for contract items, including cost of lump sum items, will be substantiated by <br />calculations. Quantity calculations will be neat and orderly and will show sketches, diagrams and dimensions <br />necessary to allow them to be independently used by field engineers. Quantity calculations will be <br />independently checked and substantiated with independent calculations. <br />Task 7.1.23 Draft Hydrology /Drainage Report <br />Huitt - Zollars will research existing improvement plans and drainage maps to obtain pertinent drainage <br />information and plot said information on a tributary map. Huitt - Zollars will determine the limits and <br />characteristics of watersheds, existing and future drainage facilities, and existing and future developments <br />affecting the project limits. The information will be included in the Hydrology Study and considered in the design <br />of drainage facilities. Design of drainage facilities will conform to current City and County standards and <br />Caltrans Highway Design Manual and current Best Management Practices in conformance with the requirements <br />of Caltrans and the Regional Water Quality Control Board. <br />Task 7.1.24 Draft Storm Water Data Report <br />Huitt - Zollars will update the PANED SWDR and ensure that the programmed project includes sufficient right -of- <br />way and budget for storm water controls and identify project- specific permanent and temporary Best <br />Management Practices (BMPs) that may be required to mitigate impacts. Drainage areas and total disturbed <br />area will be defined, as will climatic conditions, existing drainage site conditions, site permeability, soil texture, <br />existing vegetation and groundwater. <br />Task 7.1.25 Transportation Management Plan <br />In order to prevent unreasonable traffic delays resulting from construction activities, a Transportation <br />Management Plan (TMP) will be prepared to maintain acceptable levels of service and safety during all work <br />activities on the project area. TMP will identify traffic impacts for each stage of construction and provide <br />mitigation measures and their associated costs. The TMP for this project will require effective application of <br />traditional and innovative mitigation measures such as: <br />• Public /Business Information Campaign <br />• Traveler Information Strategies <br />• Incident Management <br />• Construction Staging Strategies <br />• Demand Management <br />• Alternate Route Strategies <br />• Contingency Plans <br />