Construction of the proposed overcrossing bridge will require overnight closure of SR -55 for the false work <br />erection and removal. Therefore, following are some of the specific TMP measures that may be considered <br />during the overnight closure: <br />• Provide Detour Plan <br />• Provide traffic officer along the detour route <br />• Coordinate with local law enforcement <br />• Maintain a CHP officer in TMP during the construction <br />• Media release of planned closure <br />• Install temporary changeable message signs <br />The TMP will be prepared per the latest Caltrans TMP guidelines and will address the concerns and <br />requirements of the Caltrans District 12 Traffic Manager (DTM), City of Santa Ana and the City of Irvine. The <br />TMP will reflect stage construction and traffic handling operation and will include proposed mitigation measures, <br />TMP strategies and elements, lane closure charts, TMP data sheets, TMP estimate sheets, detour plans and <br />stage construction plans, and mainline and ramp closure delay analysis. <br />Task 7.1.26 Draft Construction CPM Schedule <br />Huitt - Zollars will prepare a draft construction CPM schedule. The schedule will determine impacts during <br />construction and assist in the development of the TMP. <br />Deliverables: Huitt - Zollars will submit 40 sets of 60% plans, reduced to 11" x 17" size, Special Provisions, an <br />engineer's estimate, 4 copies of the Hydrology /Drainage Report, 4 copies of the SWPPP, 4 copies of the Traffic <br />Management Plan and 4 copies of the Construction CPM Schedule. <br />Task 7.2 Roadway 95 % PS &E <br />Huitt - Zollars will complete Roadway, Drainage, Traffic, Miscellaneous Plans, Special Provisions, the Engineer's <br />Estimate and a final Drainage Report for review by the City and Caltrans at the 95% completion stage. The title <br />sheet for specifications and reports, and each sheet of plans, will bear the professional seal, signature, certificate <br />number, registration classifications, expiration date of the certificate of the professional engineer responsible for <br />their preparation. Huitt - Zollars will prepare the following plan sheets: <br />• Title Sheet <br />• Typical Cross - section Sheets <br />• Key Map /Line Index Sheet <br />• Layout Sheets <br />• Profile /Superelevation Sheets <br />• Construction Detail Sheets <br />• Contour Grading Sheets <br />• Roadway Quantities Summary Sheets <br />• Retaining Wall Sheets <br />• Sound Wall Sheets <br />• Drainage Design Sheets <br />• Temporary Water Pollution Control Sheets <br />• Erosion Control Sheets <br />• Utility Sheets <br />• Stage Construction/Traffic Handling Sheets <br />• Construction Area Sign Sheets <br />• Pavement Delineation Sheets <br />• Sign Sheets <br />• Electrical Sheets <br />• Revised Standard Plan Sheets <br />