My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS INC 1 - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
HUITT-ZOLLARS INC 1 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 5:31:10 PM
Creation date
8/10/2009 2:32:52 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS INC
Contract #
A-2009-034
Agency
PUBLIC WORKS
Council Approval Date
4/6/2009
Insurance Exp Date
6/1/2011
Destruction Year
2020
Notes
WC: 6/1/2011; PL ex. 01/23/2011 Amended by A-2009-034-001, -002
Document Relationships
HUITT-ZOLLARS INC 1A - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
HUITT-ZOLLARS, INC. 1B - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
other media as requested; 4 copies of the Bridge Cost Estimate; 1 reproducible and 2 prints of Bridge 4 -Scale <br />Plans (English). <br />TASK 9.0 DISTRICT PS &E <br />Task 9.1 District 100% PS &E Package <br />Huitt - Zollars will complete Roadway, Drainage, Traffic, Miscellaneous Plans, Special Provisions, the Engineer's <br />Estimate and a final Drainage Report for review by the City and Caltrans at the 100% completion stage. The title <br />sheet for specifications and reports, and each sheet of plans, will bear the professional seal, signature, certificate <br />number, registration classification, expiration date of the certificate of the professional engineer responsible for <br />their preparation. The approved Structures PS &E package will be included. Huitt- Zollars will prepare the following <br />sheets: <br />• Title Sheet <br />• Typical Cross - section Sheets <br />• Key Map /Line Index Sheet <br />• Layout Sheets <br />• Profile /Superelevation Sheets <br />• Construction Detail Sheets <br />• Contour Grading Sheets <br />• Roadway Quantities Summary Sheets <br />• Retaining Wall Sheets <br />• Sound Wall Sheets <br />• Drainage Design Sheets <br />• Temporary Water Pollution Control Sheets <br />• Erosion Control Sheets <br />• Utility Sheets <br />• Stage Construction/Traffic Handling Sheets <br />• Construction Area Sign Sheets <br />• Pavement Delineation Sheets <br />• Sign Sheets <br />• Electrical Sheets <br />• Revised Standard Plan Sheets <br />• Roadway Special Provisions <br />• Roadway Engineer's Estimate <br />• Final Hydrology /Drainage Report <br />• Final Storm Water Data Report <br />• Final Traffic Management Plan (TMP) <br />• Final Construction CPM Schedule <br />• Final Storm Water Pollution Protection Plan <br />• Structures 100% PS &E <br />Task 9.2 Design Cross - Sections <br />Design cross - sections will be provided at 50 -foot intervals for design alignments. <br />TASK 10.0 LANDSCAPING PS &E <br />Task 10.1 Meetings <br />The Huitt- Zollars Team will attend one landscape kick -off meeting and up to seven Project Development Team or <br />other meetings that are focused on landscaping. Attendance by the Huitt- Zollars Landscape Team at meetings <br />beyond the eight listed are available as an additional service and fee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.