My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS INC 1 - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
HUITT-ZOLLARS INC 1 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 5:31:10 PM
Creation date
8/10/2009 2:32:52 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS INC
Contract #
A-2009-034
Agency
PUBLIC WORKS
Council Approval Date
4/6/2009
Insurance Exp Date
6/1/2011
Destruction Year
2020
Notes
WC: 6/1/2011; PL ex. 01/23/2011 Amended by A-2009-034-001, -002
Document Relationships
HUITT-ZOLLARS INC 1A - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
HUITT-ZOLLARS, INC. 1B - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Girder Layout <br />• Girder Details <br />• Typical Sections <br />• Miscellaneous Details <br />• Aesthetic Details <br />• Slope Paving <br />• Structure Approach <br />• Approach Drainage Details <br />Deliverables: The Huitt - Zollars Team will provide 4 copies of unchecked Structure Plans. <br />Task 8.3 Structures 95% PS &E (Checked Details) <br />The Huitt- Zollars Team will conduct independent checking and prepare a complete structures PS &E package for <br />formal submittal and review. Prior to completing the package, the Huitt- Zollars Team will schedule a review <br />session, if required, with the reviewing agencies to confirm the intent of informal comments on 65% structures <br />PS &E package. <br />Task 8.3.1 Structures Independent Check <br />An Independent Check will be conducted. Checking will include the preparation of an independent set of <br />structural design check - calculations and a review of the entire structural PS &E package. <br />Task 8.3.2 Structural Quantities <br />The Huitt - Zollars Team will prepare quantities for contract items, including the cost of lump sum items, which will <br />be substantiated by calculations. Quantity calculations will show sketches, diagrams and dimensions necessary <br />to allow them to be independently used by field engineers. <br />Task 8.3.3 Structures Estimate <br />The Huitt - Zollars Team will develop unit costs and prepare a structures cost estimate utilizing Caltrans' quantity <br />Summary and Estimate Forms. <br />Task 8.3.4 Structures Special Provisions <br />The Huitt- Zollars Team will prepare project specific Structure Special Provisions in accordance with Caltrans <br />standards. The Structure Special Provisions will bear the State of California Registered Professional Engineer <br />registration seal with the signature, license number and registration certificate expiration date of the Engineer who <br />prepared the Special Provisions or the Engineer under whose direction they were prepared. A list of contract items <br />with item descriptions, item numbers, and units of pay, and item pay codes, but without quantities or estimated unit <br />costs, will be included in the Special Provisions. <br />Deliverables: The Huitt - Zollars Team will provide 1 electronic copy of checked, signed Structure Plans; 10 sets <br />of prints of checked, signed Structure Plans; 4 copies of edited Structure Special Provisions; 1 copy of edited <br />Structure Special Provisions on a CD or other media as requested; 2 copies of the Bridge Cost Estimate; 1 copy <br />of bridge design calculations. <br />Task 8.4 Structures 100% PS &E <br />Upon receipt of comments, and prior to commencing revisions, the Huitt - Zollars Team will schedule a review <br />session, if required, with the reviewing agencies to confirm intent of comments. <br />The Huitt - Zollars Team will furnish Final Plans, Specifications and Estimate for advertising, as well as hard copy <br />and electronic files of spreadsheets used to create the estimates. The structures PS &E will incorporate 100% <br />comments from reviewing agencies. <br />Deliverables: The Huitt - Zollars Team will complete structures PS &E and provide 1 electronic copy of checked, <br />signed Structure Plans; 1 set of full -size reproducible of final Structure Plans, 4 sets of prints of final Structure <br />Plans; 4 copies of final Structure Special Provisions; 1 copy of the final Structure Special Provisions on a CD or <br />
The URL can be used to link to this page
Your browser does not support the video tag.