Laserfiche WebLink
City of Santa Ana <br />Santa Ana Zoo Front Entrance <br />February 4, 2008 <br />Page 3 <br />Construction Documents Summary: <br />L -1 Irrigation plan (1 " =20') <br />L -2 Irrigation details and calculations <br />L -3 Planting plan (1 " =20') <br />L-4 Planting Details <br />• Specifications (City format) <br />• Soil testing, evaluation by Wallace laboratories <br />• Arborist Report to be provided by City of Santa Ana if required <br />TASK 4 — Bidding: <br />4.01 Assist the team in preparation of bid packages <br />4.02 Attend pre -bid meeting <br />4.03 Assist response to bidder's RFI's <br />4.04 Assist in preparing addendums <br />TASK 5 — Construction Administration (6 Site and /or Nursery Visits): <br />5.01 Attend construction kick -off meeting (1) <br />5.02 Process product submittals /shop drawings <br />5.03 Attend periodic construction reviews (allow 2) <br />5.04 Construction administration meetings (allow 1) <br />5.05 Assist preparation of change orders <br />5.06 Assist preparation of RFI's <br />5.07 Prepare final punchlist prior to commencement of maintenance period (1 visit) <br />5.08 Review end of maintenance review (1 visit) <br />5.09 Prepare as -built plans <br />5.10 Prepare project close out <br />