My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BELL BUILDING MAINTENANCE COMPANY 2 - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2019
>
BELL BUILDING MAINTENANCE COMPANY 2 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 3:34:02 PM
Creation date
8/21/2009 2:07:20 PM
Metadata
Fields
Template:
Contracts
Company Name
BELL BUILDING MAINTENANCE COMPANY
Contract #
A-2009-113
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
8/3/2009
Expiration Date
6/30/2011
Insurance Exp Date
1/10/2011
Destruction Year
2019
Notes
Amended by A-2009-113, -01, -02, A-2012-159, A-2014-072
Document Relationships
BELL BUILDING MAINTENANCE COMPANY 2A - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
BELL BUILDING MAINTENANCE COMPANY 2B - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
BELL BUILDING MAINTENANCE COMPANY 2C - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
BELL BUILDING MAINTENANCE INC. 2D - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />GENERAL SCOPE OF WORK <br />The Contractor shall furnish all supervision, labor, equipment, materials, and supplies required to perform <br />janitorial services at various locations. <br />➢ Work performed at properties listed in this specification will be administered by the Finance <br />Department — Building Maintenance Division and are subject to work hours and standards listed <br />in the specification. <br />The following terms and conditions pertain to this specification in its entirety. <br />1.0 QUALITY CONTROL <br />1.1 Quality Control Program: Submit your QUALITY CONTROL PROGRAM as part of your <br />proposal and include at a minimum, the following: <br />I. Weekly and monthly inspection system reports covering all the services listed in this <br />RFP. It shall specify each office, room and/or general area listed in this RFP and its <br />observed state of cleanliness. <br />2. Methods for identifying and correcting deficiencies in quality of service. <br />3. Contractor shall maintain a file of inspections conducted and when applicable, take <br />corrective action. A copy of each inspection and documented corrective action shall be <br />delivered to the Property & Facilities Manager within seven (7) calendar days from the <br />date of inspection. <br />4. Detail staff overseeing the quality control program. <br />2.0 BUILDING SECURITY <br />The contractor shall keep all exterior doors locked during the performance of work or as otherwise directed <br />and shall ensure that all doors are locked at the end of the shift unless otherwise noted. Offices with <br />security systems shall be activated immediately after work is completed in that area. The Contractor shall <br />be responsible for any lost keys, card keys and any inherent damages (i.e., re- keying of the whole facility). <br />This cost shall be withheld from payment(s). The decision to re -key the whole facility is solely that of the <br />City's Facilities Maintenance Superintendent. <br />3.0 EQUIPMENT USAGE <br />There shall be no usage of city equipment, telephones, or facilities by the contractor's staff except for a <br />telephone designated for business use by City staff or as otherwise allowed by City staff coordinating this <br />contract. The City may ask the contractor to remove staff from the site if they are found to be in violation <br />of this policy. Electrical power (I 10) volts will be furnished by the City as existing power outlets for the <br />contractor's use to operate such equipment necessary in the conduct of his work. The Contractor shall be <br />responsible for any damage caused to the electrical outlets and their covers caused by improper <br />disconnection of equipment. Hot and cold water will also be made available as necessary for cleaning. <br />4.0 CONTRACTOR RESPONSIBILITY <br />It is the Contractor's responsibility to verify and measure the square footage to be cleaned and priced <br />accordingly. It is also the Contractor's responsibility to accurately estimate the supplies needed for the <br />
The URL can be used to link to this page
Your browser does not support the video tag.