My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - ENERGY EFFICIENCY IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
09/08/2009
>
25D - ENERGY EFFICIENCY IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:16:56 PM
Creation date
9/1/2009 2:52:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25D
Date
9/8/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A City of Santa Ana <br />Scope of Work Phase II <br />Siemens Building Technologies, Inc. <br />1.1.2. HVAC Equipment Replacement <br />Total price for this portion of the Work: $697,065 <br />Buildings Included: <br />City Facilities: <br />• Bowers Museum <br />• City Hall -Ross Annex <br />• Corporate Yard <br />• Fire Stations 4,6,9 <br />• SW Senior Center <br />Scope of Work <br />^ Contractor's Work is limited to work above the roofline for rooftop except for items <br />specifically stated below <br />Roof Mounted Package Unit Replacements (a Fire Stations Bowers Museum Corporate Yard <br />and SW Senor Center <br />• Contractor to remove the existing rooftop unit(s) and provide for disposal, including <br />refrigerant. <br />• Remove existing units, listed below in Table 1, and install new replacement HVAC <br />unit(s) as set forth in Table 2, below. Unit will be fit to the existing curb and the ex- <br />isting zone head. Replace or repair defective roof curbs. Provide start-up of new <br />unit. <br />• New units to be high efficiency (11.3 EER minimum) units of same capacity and <br />configuration complete with economizer. <br />• Unit will be of equal or lesser weight than existing units. <br />• .Provide and wire smoke detectors for applicable new units. <br />• Provide seismic attachment to meet existing applicable codes. <br />• Following installation, Contractor shall perform a certified Air Balance of the System <br />(sample attached as Attachment 1). Contractor shall not be responsible for correc- <br />tive measures <br />• .Provide new ductwork above roofline and connect to ductwork below. <br />• Provide for connection and termination of new condensate drain lines (copper) to <br />meet existing applicable building codes. <br />25D-23 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.