Laserfiche WebLink
Exhibit A City of Santa Ana <br />Scope of Work Phase II <br />Siemens Building Technologies, Inc. <br />• Provide engineering as needed for the installation of these units. <br />Roof Mounted Ice Bear System Installation at the Corporate Yard <br />Total price for this portion of the Work is $50,800 <br />Provide and install an Ice Bear System at the Corporate Yard <br />• Contractor shall certify that new ICEBEAR air conditioner shall meet structural en- <br />gineering earthquake requirements to install the ICEBEAR water/ice storage unit on <br />the roof of the Fleet Building at the Corporation Yard. <br />TABLE 1: CURRENT EQUIPMENT LIST (UNITS WILL BE REPLACED WITH CARRIER R- <br />410A MODEL) <br />Location Model # 't"ype Tonnage Qty <br />Fire Station # 4 Carrier 48TJD008-511 GA Gas-Electric 7.5 1 <br />Fire Station # 4 Carrier 48SS-030040311 Gas-Electric 2.5 1 <br />Fire Station # 4 Carrier 48SS-042060xxx Gas-Electric 3.5 1 <br />Fire Station # 4 Carrier 48SS-042060521AA Gas-Electric 3.5 1 <br />Fire Station # 6 Lennox GCS3-411-120 Gas-Electric 4 2 <br />Fire Station # 9 Carrier 48NLT036 Gas-Electric 3 4 <br />Fire Station # 9 Carrier 48NLT048 Gas-Electric 4 1 <br />Corporate Yard/ <br />Fleet Lennox GCS16-1353-270-7G Gas-Electric 10 1 <br />Corporate Yard/ <br />Fleet Lennox GCS16-413-75-5G Gas-Electric 5 2 <br />Corporate Yard/ <br />Warehouse Lennox GCS16-1603-270-4G Gas-Electric 10 1 <br />Corporate Yard/ <br />Warehouse Lennox GCS16-953-200-6G Gas-Electric 7.5 1 <br />25D-24 <br />