My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - ENERGY EFFICIENCY IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
09/08/2009
>
25D - ENERGY EFFICIENCY IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:16:56 PM
Creation date
9/1/2009 2:52:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25D
Date
9/8/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A City of Santa Ana <br />Scope of Work Phase II <br />Siemens Building Technologies, Inc. <br />Bowers Museum Carrier 48TCLA05A1A6-OAOAO Gas-Electric 4 1 <br />Bowers Museum Carrier 48TCDA08A1A6-OAOAO Gas-Electric 7.5 1 <br />Assumptions for work listed above <br />• .Asbestos abatement to be done by the City in advance of the Work proceeding. <br />• Work to be done during normal hours. <br />• Installation work to be in accordance with Prevailing Wage requirements for area. <br />Exclusions <br />The items listed below are not included in the Work and have not been included in the <br />price. As the Work advances, Contractor and the City may agree to expand the Work and <br />increase the price to include the items listed below (except for the abatement and removal <br />of hazardous materials). <br />• There is no provision to modify the existing housekeeping pads unless specifically <br />outlined in this scope of work <br />• There is no hazardous material (asbestos, lead paint, mold etc.) material abatement <br />or removal included in the Work. City is responsible for abatement. Hazardous <br />areas are assumed to have been tagged. <br />Contractor will not provide painting and patching beyond what is specifically de- <br />scribed in this scope of work. <br />• Contractor is not responsible for temporary cooling. <br />• Contractor is not responsible for repair of any faulty or non-code wiring. <br />• Contractor is not responsible for repair or replacement of existing duct work. <br />• The Scope of Work assumes strengthening of the existing roof structure will not be <br />required. Strengthening of the roof structural members, if required, is considered an <br />additional service. <br />• Contractor is not responsible for repair of any damaged structural members caused <br />by water, termites or any other unknown damage to existing members. <br />1,1.3. Mechanical Upgrades <br />Total price for this portion of the Work is $155,837 <br />Ross Annex -Convert Inlet Guide Vanes Control to Variable Freauency Drives Control <br />25D-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.