My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - ENERGY EFFICIENCY IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
09/08/2009
>
25D - ENERGY EFFICIENCY IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:16:56 PM
Creation date
9/1/2009 2:52:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25D
Date
9/8/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A City of Santa Ana <br />Scope of Work Phase II <br />Siemens Building Technologies, Inc. <br />^ Field supply and install VFD's on supply and exhaust fans for Trane Intellipak units <br />AC-1, 2, and 3 <br />^ Field supply and install new main processor board, control cards, static pressure <br />sensors and communication cable in units <br />^ .The units will be UL recertified after the modifications are completed. <br />^ Following installation, Contractor shall perform a certified Air Balance of the Sys- <br />tem. Contractor shall not be responsible for corrective measures. <br />Assumptions for Work listed above <br />• Asbestos abatement to be done by the City. <br />• Work to be done during 2nd shift, or weekends if necessary. <br />• Do not include provisions for temporary cooling <br />• Installation work to be in accordance with Prevailing Wage requirements for area. <br />Exclusions <br />The items listed below are not included in the Work and have not been included in the <br />price. As the Work advances, Contractor and the City may agree to expand the Work and <br />increase the price to include the items listed below (except for the abatement and removal <br />of hazardous materials). <br />• There is no provision to modify the existing housekeeping pads unless specifically <br />outlined in this scope of work <br />• -There are no hazardous materials (asbestos, lead paint, mold etc.) addressed with- <br />in the Work. City is responsible for abatement work. Hazardous areas are assumed <br />to have been tagged. <br />• Contractor will not provide painting and patching beyond what is specifically de- <br />scribed in this scope of work. <br />• Contractor is not responsible for repair of any faulty or non-code wiring <br />• Contractor is not responsible for repair or replacement of existing duct work. <br />• This proposal assumes strengthening of the existing roof structure will not be re- <br />quired. Strengthening of the roof structural members, if required, is considered an <br />additional service along with any costs incurred for approval. <br />• Contractor is not responsible for repair of any damaged structural members caused <br />by water, termites or any other unknown damage to existing members. <br />25D-27 g <br />
The URL can be used to link to this page
Your browser does not support the video tag.