My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-09-08
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
09/08/2009
>
FULL PACKET_2009-09-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 4:41:56 PM
Creation date
9/2/2009 2:44:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/8/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gt%. <br />one Mission, Yours. <br />Santa Aan Police Department <br />Interoperabili(v Communications Consulting <br />GTSI -09 -11453 v3.0 <br />jurisdictions /agencies and to provide direction to the GTSI Team Project Manager as <br />needed. This individual will be responsible for making a final determination of needs, <br />capabilities and requirements in the event that members and/or representatives of the <br />CalSIEC Southern Planning Area are unable to reach a consensus. This level of authority <br />is needed to help the project to be completed within the desired time frame. <br />• For pricing purposes, the project start occurs on Monday, August 17, 2009 and ends on <br />Monday, August 16, 2010. <br />• The SAD shall grant the required access and credentials to allow GTSI Team <br />representatives to work on -site at participating jurisdictions and agency locations, when <br />needed. <br />• The SPD shall identify the appropriate individuals to participate in meetings and data - <br />gathering sessions and, to the extent possible, provide the coordination necessary with <br />jurisdictions to facilitate the time - allocations required to allow jurisdictions /agencies <br />participation in these critical roles. <br />• Our team expects significant interactions with the participating members of the CA <br />Southern Planning Area through a variety of meetings. Given the importance of these <br />meetings, and their impact on the anticipated schedule, we have made several key <br />assumptions: <br />• The SPD administrative support staff shall be responsible for communicating <br />meeting schedules and coordinating meeting logistics (i.e. providing meeting <br />rooms, laptop projectors, conference phones). <br />• It is assumed that 100% attendance of jurisdictions and participating agency <br />members at each of the meetings may not be achievable but that those members <br />present shall be vested with the authority to approve any meeting action items or <br />plans. <br />• It is further assumed that multiple meetings on a singular set of topics shall not be <br />required to accommodate various jurisdictions and participating agency member <br />schedules. <br />• Given the importance of this effort, we assume that members of the CA Southern <br />Planning Area and participating jurisdictions and agencies shall provide requested <br />information in a timely manner. The GTSI Team Project Manager shall identify <br />information needs for the group and establish deadlines for submitting this information <br />for GTSI Team's use in the analysis and development of applicable plans and documents. <br />• We assume that each Operational Area has current operational and system documentation <br />available, including detailed information on each agency's radio systems, sites, and <br />related information and access to Tactical Interoperability Communication Plan (TICP) <br />standards and guidelines. <br />• The CaISIEC Southern Planning Area and member jurisdictions and agencies are <br />responsible for all permits, licenses, leases, and any other requirements that enable the <br />use of selected sites, frequencies, and /or equipment for the system design. These fees, if <br />necessary, are not included in this proposal. <br />• The GTSI Team has identified the requirement to access the following materials, <br />resources, and information in order to complete the services and tasks identified above. <br />This list is not meant to be comprehensive of all materials, resources, and information, <br />-8- <br />GTSI Confidential and Proprietmy. Use or disclosure of the data contained on this sheel is snbjecl to the restrictions on the title page of this <br />proposal. <br />25P -21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.