My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-09-08
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
09/08/2009
>
FULL PACKET_2009-09-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 4:41:56 PM
Creation date
9/2/2009 2:44:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/8/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gtsL. <br />No MIsslon. Yours. <br />Santa Ana Police Department <br />Interoperabilitp Communications Cotnsttlting <br />GTSI -09 -11453 n3.0 <br />Inventory and utilization plan for VHF (high and <br />low), UHF, 700 and 800 MHz bands currently being <br />used in each of the SPA Operational Areas as <br />6/11/2010 <br />$ 114,018.04 <br />interoperability channels submitted <br />Inventory of agencies within the SPA using <br />CaISIEC controlled interoperability channels <br />between 30 -869 MHz with status of FCC licenses <br />6/18/2010 <br />$ 114,018.04 <br />submitted <br />Inventory of agencies with the SPA using <br />interoperability channels between 150 -512 MHz <br />that conform to narrowband migration and <br />6/25/2010 <br />$ 114,018.04 <br />ppqration submitted <br />Transition plan for SPA interoperability channels <br />between 150 -512 MHz that conform to FCC <br />7/9/2010 <br />$ 114,018.04 <br />narrowband requirements submitted <br />Provide technical planning support to Tribal and <br />nongovernmental agencies within the SPA to <br />identify interoperable communication solutions. <br />7/15/2010 <br />$ 114,018.04 <br />Report on identified pathways and potential <br />solutions submitted <br />Develop and present to the SPA for adoption, <br />various documents for inclusion as regional input to <br />the California Interoperability Field Operations <br />7/24/2010 <br />$ 48,158.55 <br />Guide (I -FOG). Number of individual documents <br />not to exceed 6 <br />Assessment and Gap Analysis Report on each <br />established SPA UASI TICP. Report on findings <br />7124/2010 <br />$ 48,158.55 <br />submitted <br />Riverside /San Bernardino UASI TICP compliance <br />report submitted <br />7/30/2010 <br />$ 48,158.55 <br />Inyo Operational Area UASI TICP compliance <br />re rt submitted <br />7/30/2010 <br />$ 48,158.55 <br />Mono Operational Area UASI TICP compliance <br />re rt submitted <br />7/30/2010 <br />$ 48,158.55 <br />San Luis Obispo Operational Area UASI TICP <br />cam fiance report submitted <br />7/30/2010 <br />$ 48,158.55 <br />Santa Barbara Operational Area UASI TICP <br />rn <br />compliance report submitted <br />7/30/2010 <br />$ 48,158.55 <br />Ventura Operational Area UASI TICP compliance <br />report submitted <br />7/30/2010 <br />$ 48,158.55 <br />GYSl Confidential and Proprietaty. Use or disclosure of the data contained on this sheet is subject to the restrictions on the tide page of this <br />proposal. <br />25P -23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.