My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23D - FLOWER ST CONTRACT AWARD PROJ 60-29-C
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
10/05/2009
>
23D - FLOWER ST CONTRACT AWARD PROJ 60-29-C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:15:53 PM
Creation date
10/2/2009 1:20:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23D
Date
10/5/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />OCTOBER 5, 2009 <br />TITLE: <br />CONTRACT AWARD FOR FLOWER <br />STREET BIKE TRAIL EXTENSION, <br />PHASE 1, FROM UNION PACIFIC <br />RAILROAD TO MACARTHUR BOULEVARD <br />(PROJECT N0.08-6029-C) <br />,1 <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 15` Reading <br />^ Ordinance on 2"d Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract to I.C.E. Engineering, Inc., the lowest responsible <br />bidder, in accordance with unit bid prices for the base bid in the <br />estimated amount of $726,208 for construction of Flower Street Bike <br />Trail Extension, Phase 1, from Union Pacific Railroad to MacArthur <br />Boulevard. <br />2. Approve a Funding Analysis with a total estimated construction cost <br />of $931,900. <br />DISCUSSION <br />The Flower Street Bike Trail Extension project has the potential to <br />increase bicycle commuting. The first phase of this project will make <br />strides towards providing a connection between the Alton Bike Trail and <br />the Sunflower Avenue Bike Trail, providing bicycle access to the South <br />Coast Metro business park and connection to Santa Ana's Golden Loop trail <br />system (Exhibit 1). <br />The project consists of asphalt paving, installing guard cable and <br />wrought iron fences along the channel, installing a drainage system, <br />signing and striping, landscaping, and irrigation using reclaimed water. <br />Once completed, the bike trail will provide safety and security to <br />pedestrians and bicyclists. <br />The Notice Inviting Bids was advertised on August 12 and 14, 2009, and <br />bids were opened on September 4, 2009. A summary of the bid invitations <br />mailed, the bids received, and the bid results follows. <br />Santa Ana Contractors receiving notices: 16 <br />Contractors requesting bidding documents: 19 <br />Bids received: 9 <br />Bids received from Santa Ana Co~t~s: 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.