My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - FIFTH STREET REHAB
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
11/02/2009
>
23B - FIFTH STREET REHAB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 11:00:23 AM
Creation date
10/28/2009 9:49:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23B
Date
11/2/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />NOVEMBER 2, 2009 <br />TITLE: <br />CONTRACT AWARD FOR <br />FIFTH STREET REHABILITATION <br />BETWEEN JACKSON AND SULLIVAN <br />STREETS(PROJECT NO.091742) <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on 1" Reading <br />❑ Ordinance on 2 "d Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract to All American Asphalt, the lowest responsible <br />bidder, in accordance with unit bid prices for the base bid in the <br />estimated amount of $833,501.50 for construction of Fifth Street <br />Rehabilitation between Jackson and Sullivan Streets. <br />2. Approve a Funding Analysis with a total estimated construction cost <br />of $1, 041, 900. <br />DISCUSSION <br />The segment of Fifth Street between Jackson and Sullivan Streets has <br />been identified as a high priority by the City's Pavement Management <br />System (Exhibit 1). The pavement is deteriorating due to weather, age, <br />and heavy usage. Some of the adjacent curbs, gutters, driveway <br />approaches, bus pads, curb ramps, and sidewalks are also in various <br />states of disrepair and require replacement. <br />This project provides for construction of new street pavement, <br />replacement of damaged and installation of new concrete curbs, gutters, <br />driveway approaches, bus pads, curb ramps, and sidewalks. Once <br />completed, these improvements will enhance the ride quality, surface <br />drainage, and visual appearance of the street. <br />The Notice Inviting Bids was advertised on September 11 and 14, 2009, <br />and bids were opened on October 1, 2009. A summary of the bid <br />invitations mailed, the bids received, and the bid results follows. <br />23B -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.