My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECONOLITE TRAFFIC ENGINEERING AND MAINTENANCE, INC. (AEGIS, ITS) - 2009
Clerk
>
Contracts / Agreements
>
E
>
ECONOLITE TRAFFIC ENGINEERING AND MAINTENANCE, INC. (AEGIS, ITS) - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2014 1:37:45 PM
Creation date
11/20/2009 10:58:48 AM
Metadata
Fields
Template:
Contracts
Company Name
ECONOLITE TRAFFIC ENGINEERING & MAINTENANCE INC. (AEGIS, ITS)
Contract #
A-2009-124
Agency
Public Works
Council Approval Date
8/17/2009
Expiration Date
8/31/2012
Insurance Exp Date
4/27/2013
Destruction Year
2017
Notes
EFFECTIVE 1/1/12 ECONOLITE MERGED INTO AEGIS, ITS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Maintenance Record: <br />The Contractor shall maintain a record log in each controller cabinet <br />showing the date and time of any service. It shall consist of: <br />o Routine Maintenance <br />c Extraordinary Maintenance <br />All records shall be legibly written or printed. These record logs shall <br />become property of the City. <br />(b) Closed Circuit Television (CCTV): <br />(i) Maintenance period: <br />The Contractor shall perform a complete inspection and service of each <br />CCTV once every three (3) months for proper operation and cleanliness. <br />(ii) Maintenance Tasks: <br />• Cabinets (if applicable): <br />Some CCTV locations have dedicated type 332 cabinet. For these <br />locations, the Contractor shall clean the cabinets thoroughly on the <br />inside, including all components. The Contractor shall remove all <br />unauthorized external attachment such as notices, posters, signs, etc. <br />and notify the City of any graffiti that is on the signal equipment. It is <br />not the Contractor's responsibility to remove the graffiti <br />o Ventilation system: <br />The contractor shall ensure that the cabinet's ventilation system is <br />in working order. Ensure that the Thermostat and Fan operates <br />properly. The air filter shall be replaced and dated every 90 days <br />(regardless of condition). <br />o Battery Backup System (if applicable): <br />The Contractor shall ensure that the battery backup system is <br />charged and in working order. <br />• Field Equipment <br />1, The Contractor shall check all poles and standards for damages. <br />2. The contractor shall clean the camera's housing lens or dome as <br />appropriate. <br />(iii) Maintenance Record: <br />The Contractor shall maintain a record log in each location (with or <br />without dedicated cabinet) showing the date and time of any service. It <br />shall consist of: <br />a. Routine Maintenance <br />b. Extraordinary Maintenance <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.