My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC COAST CABLING - 2009
Clerk
>
Contracts / Agreements
>
P
>
PACIFIC COAST CABLING - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:18:09 PM
Creation date
11/20/2009 11:36:04 AM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC COAST CABLING
Contract #
A-2009-148
Agency
Finance & Management Services
Council Approval Date
9/8/2009
Expiration Date
8/30/2011
Insurance Exp Date
1/1/2010
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.2.1 A job walk will be arranged to allow the Vendor a first hand view of the prospective <br />work site and to provide the opportunity to clarify cabling details. <br />8.2.2 A job walk will only be held for work that the City's Telecommunications <br />Coordinator or his/her delegated representative has determined will require a <br />substantial amount of design/planning. <br />8.2.3 When the job walk is completed, the Vendor will provide a cost estimate with time <br />schedule to perform the requested cabling service utilizing the City's Cabling <br />Services Proposal Form. A sample form is located in Appendix B. <br />8.2.4 Work may proceed only after the City's Telecommunications Coordinator or his/her <br />delegated representative has signed the completed Cabling Services Proposal <br />Form (thereby authorizing the work) and has returned it (via fax, mail, by hand, <br />etc.) back to the Vendor. <br />8.2.5 If the City considers a Cabling Services Proposal to be out of line with existing <br />industry cost or practices, the City reserves the right to reject the proposal and to <br />have the work performed either by another vendor or by the City itself. <br />8.3 Services NOT requiring a job walk <br />8.3.1 When the scope of work calls for the simple addition of several cable drops, a job <br />walk is not necessary and billing can usually be handled on a Time and Material <br />basis - as determined by the City's Telecommunications Coordinator or his/her <br />delegated representative. However, a Cabling Services Proposal Form still needs <br />to be completed by the Vendor and approved by the City's Telecommunications <br />Coordinator orhis/her delegated representative. <br />8.4 Change of Work to be performed <br />8.4.1 If during the performance of approved cabling services it is determined by the <br />Vendor that there will be a substantial increase to the scope of work (and <br />subsequent increase in cost and time schedule) as described in the Cabling <br />Services Proposal Form, work is to immediately stop and is not to continue without <br />the approval of the City's Telecommunications Coordinator or his/her delegated <br />representative in the form of a signed Vendor-provided Change Order Form. <br />8.5 Taxes <br />All applicable taxes shall be included under the Pricing Plan portion of any the Cabling Services <br />Proposal Form (see Appendix B). <br />8.6 Payment Schedule <br />The City will pay invoices based on the following schedule: <br />8.5.1 Material: Upon Acceptance by the City's Telecommunications Coordinator or <br />his/her delegated representative of the completed project as specified in 2.11 of <br />Appendix E "Technical Standards and Operating Procedures for Cabling Services" <br />Page 13 of 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.