My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC COAST CABLING - 2009
Clerk
>
Contracts / Agreements
>
P
>
PACIFIC COAST CABLING - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:18:09 PM
Creation date
11/20/2009 11:36:04 AM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC COAST CABLING
Contract #
A-2009-148
Agency
Finance & Management Services
Council Approval Date
9/8/2009
Expiration Date
8/30/2011
Insurance Exp Date
1/1/2010
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
transportation required for the work to performed safely and satisfactorily. <br />2.3.2. Provide all work necessary to complete the project safely and <br />satisfactorily, whether or not it is specifically spelled out in the scope of <br />work. <br />2.3.3. Coordinate your installation work with other trades: <br />2.3.3.1.Assume responsibility for any cooperative work that must be altered <br />due to lack of proper supervision of failure to make proper provision in <br />time. <br />2.3.3.2.Perform alterations, based upon parameters specified herein, or based <br />upon industry standards, whichever is to the satisfaction of the <br />Telecommunications Coordinator, and pay all costs. <br />2.3.4. Resolve code conflicts prior to installation. Remove and replace all work <br />conflicting with codes or, in the Telecommunications Coordinator's opinion, <br />not meeting specified requirements, and pay all costs. <br />2.3.5. Permits: Obtain permits and inspections, and pay all fees. Deliver all <br />certificates of inspection to the Telecommunications Coordinator. <br />2.3.6. Guarding: <br />2.3.6.1.Provide protection for hazardous conditions. <br />2.3.6.2.Provide industrial accident and warning signs per ANSI and OSHA. <br />2.3.6.3.Erect and maintain suitable barriers, protective devices, lights, and <br />warning signs for the protection of the public and employees from the <br />work being undertaken. <br />2.3.6.4.Conform to applicable safety regulations, including those of the <br />Telecommunications Coordinator. <br />2.3.7. Erection and installation techniques, including structural adequacy and <br />bracing suitable for stability and/or seismic Zone Four conditions. <br />2.3.8. No changes or additions shall be made to the scope of work of any given <br />project except by written, fully documented, and cost approved change <br />order. If the vendor without an approved change order performs changes or <br />additions, the vendor assumes full responsibility for any consequences of <br />changes or additions so made and must bear all costs associated with said <br />changes or additions. <br />Page 11 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.