Laserfiche WebLink
i' Y \ 1''. ~ - <br /> ~',1`~~t - <br /> 3 ~ y <br /> ~ ~ . <br /> ~ 1. <br /> . /2t • , <br /> 'r ~ <br /> 7~ rid.. ~~casta~ <br /> I <br /> _ ~ <br /> - -:'~...C - <br /> - <br /> _.9.. ~ _~~S ~ <br /> -t t <br /> for some of our clients have come in 40°~b below the cost of similar projects a year ago so we wUl <br /> base our cost estimates on recent experience with projects that fait into an expected cost range <br /> for when the projects wilt be constructed. The City of Santa Ana will be providing cost estimates <br /> ~ for the projects on its list. To achieve consistency, we propose to first have our roadway design <br /> engineers consult with Santa Ana staff and recommend appropriate unit cost factors based on <br /> ~ both our recent experience and the City's data. We will meet with staff from both Cities to agree on <br /> consensus cost factors that will be consistently applied to the improvements in the study. <br /> ! The cost estimates will include factors for planning, engineering, and environmental studies, as <br /> well as an appropriate contingency factor. The unit cost for right-of--way (which will fikefy involve <br /> different unit costs for different land use types) will be determined in consultation with both <br /> R Cities' staff. Schematic design drawings of roadway segment and intersection projects (including <br /> ~ anticipated turn pocket lengths and other appropriate design components) will be developed on <br /> the most current readily available aerial mapping. This and cursory filed reviews will be used to <br /> assist in identifying critical constraints and estimating both construction quantities and right-of-way <br /> acquisition costs. <br /> 4 <br /> Subtask B.1: identify Improvements Needed for Existing Conditions <br /> f? <br /> ~ 1. tdentify improvements needed to mitigate existing congestion. (These will be excluded from the <br /> nexus analysis.) Calculate LOS with improvements. <br /> 9 Subtask B.2: identify Future Improvements <br /> 4 1. Identify additional improvements needed to mitigate 2019 congestion. Calculate LOS with <br /> (mprovements. <br /> 2. Identify additional improvements needed to mitigate 2035 congestion. Calculate LOS with <br /> ~ improvements. <br /> 3. Submit improvement fists to Cities for review/comment and concurrence. <br /> ~ Subtask B.3: Develop Cost Estimates <br /> 1. Prepare aplanning-?evet project improvement cost template. <br /> 2. Review Santa Ana cost estimates and unit cost assumptions, along with recent available <br /> ~ construction cost information, and recommend appropriate methods and unit cost factors to <br /> <br /> 1 apply in this study. <br /> 3. Meet with Santa Ana and Tustin staff to develop consensus on a consistent costing <br /> methodology and unit cost factors. <br /> 4. Prepare schematic design drawings of roadway and intersection widening Improvements on <br /> aerial photographs. Drawings will be prepared for improvements in the Tustin portion of the <br /> study area, and for improvements in the Sonia Ana portion identified in Subtask B.2 but not <br /> on the City's initial list of improvement projects (Santa Ana staff will provide the cost estimates <br /> for those). For budgeting purposes, we have assumed two miles of roadway widening/ <br /> construction, two railroad overcrossings, and tour intersection widening projects. <br /> 1 1 171770153.09 <br /> Klmley-Hom <br /> ~ and Associates, inc. <br /> 25C-21 <br /> <br />