Laserfiche WebLink
}j/ ~ t <br /> h <br /> S <br /> •~Y' E w <br /> - - ~ '-n ~ <br /> STUDY TWO: SANTA ANA <br /> ~ Study Two involves updating the fee program for the rest of Santa Ana outside the joint TSIA area <br /> with Tustin. Since the RFP's requested tasks and our scope of work are essentially the same <br /> as Study One, we are nat repeating the material presented above for Study One. Rather, the <br /> discussion below presents only those elements of our approach that will be different than in Study <br /> One. <br /> Task A: Forecast Traffic <br /> ` ~ For the sake of consistency between the two s#udies, we propose that the 2035 modeling <br /> performed for Study One also be used for Study Twv. (Study Two does not involve a Year 2019 <br /> scenario.) So the 2035 model runs will be based on future land use growth throughout the entire <br /> ~ City of Santa Ana as well as the TSIA portion of Tustin. In our cost esfimate, labor hours have been <br /> split between the two studies for the 2035 modeling tasks that will be performed in the same model <br /> runs. <br /> The following activities are different than Study One: <br /> ~ The Study Two land use and trip generation involve only the 2035 scenario and not an interim <br /> scenario for 20#9. <br /> • For budgeting purposes, we have assumed that we will conduct new traffic counts at up to 30 <br /> midblock locations (24 hours) and 20 intersections (AM and PM peak turning movements) <br /> Trip tables, traffic forecasts, and LOS analysis will be performed for 2035, but not 2019. <br /> Task A Deliverables and Meetings <br /> ¦ We will provide eight copies plus an electronic version In MS Word of the technical <br /> memorandum. <br /> We will have one meeting w?th Santa Ana staff to review/discuss comments on the technical <br /> memorandum. <br /> Task B; Review/Update Transportation Improvement Projects <br /> Task B will follow the same rocess as in Stud One exce t that the im rovement ro ects wi0 be <br /> P Y ~ P p p l <br /> located in the rest of Santa Ana outside the joint Santa Ana/Tus#in TS1A area. The following activities <br /> cif. are different than Study One: ~ <br /> For budgeting purposes, we have assumed that schematic design drawings and cost <br /> <br /> r~n~ estimates will be prepared for 2 miles of roadway widening/construction projects and <br /> 10 intersection widening projects. (Santa Ana staf# will provide the cost estimates for the <br /> improvements on the City's initial lis#.) <br /> _ Task B Deliverables and Meetings <br /> • We will provide eight copies pins an electronic version in MS Word of the technical <br /> memorandum. <br /> 16 I TL770153.09 v f~mley-Hom <br /> ? and Associates, Inc. <br /> 25C-26 <br /> <br />