My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - LANDSCAPE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
02/16/2010
>
25C - LANDSCAPE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:11:30 PM
Creation date
2/9/2010 8:45:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
2/16/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in the detez•mination of City staff, an unsafe lip situation exists {an unsafe <br /> lip is %2" or greater) in any turf/brick dust border area infield to brick <br /> dust, base-paths or brick dust to outfield), contractor will be required to <br /> remove or level the soil build-up with a sod cutter and re-establish the in- <br /> field boundaries with a string line or suitable method and re-sod up to the <br /> border to remedy the situation at contractors expense. Pre-existing <br /> conditions shall be corrected during contract start-up. <br /> 7.6 Final Watering <br /> 7.6.1 This is the most time consuming and a ver~portant element of the <br /> ,procedure. <br /> 7.6.2 The contractor shall final water the skinned brick dust to a depth of 1/4" <br /> minimum. <br /> SA Rainy Weather/Wet Field Procedure <br /> 8.1 On the next scheduled working day after a rainfall, the following procedure, in the order <br /> listed, shall be adhered to: <br /> 8.1.1 Remove all standing water fiom Iow spots either by skimming off excess <br /> water and spreading it out to dry areas or using apump/sopper system. <br /> 8.1.2 Rake out (scarify) wet areas. <br /> 8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brick dust <br /> Materials from stock to all Wet Areas and Rake Out. <br /> 9.0 Work to be Completed "Bl-MONTHLY" <br /> 9.1 To maintain levelness of all fields, contractor shall, once every two months, scarify <br /> drag built up amounts of materials at high spots and cut and level drag the scarified <br /> material to law spots. The Contractor shall fill any remaining low spots with new Gail <br /> Materials "Pro Gold with Stabilizer" brick dust from stock and make level. <br /> Note: Staff shall identify areas to scarify/cut and level drag to <br /> the contractor at weekly meetings with contractors <br /> appointed site supervisor {as per section 6.2 of contract). <br /> 9.2 Heavy water scarified and cut and leveled areas to a min, depth and allow settling in <br /> before play on field. <br /> Note: Due to heavy watering and its need to settle befoz•e play, <br /> staff shall provide a schedule of bi-monthly scarify/cut <br /> and level drag dates to contractor. <br /> <br /> 10.0 Work to be Completed "ANNUALLY" <br /> 10.1 Each year, the following renovation is to be done on all fields in conjunction with the <br /> City's Annual Sports Turf Renovation Schedule. Fields renovated may change from <br /> year to year. <br /> 25C-116 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.