My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - LANDSCAPE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
02/16/2010
>
25C - LANDSCAPE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:11:30 PM
Creation date
2/9/2010 8:45:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
2/16/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10,1,1 Contractor shall laser grade each ball diamond. Contractor shall scarify <br /> drag built up amounts of materials at high spots and cut and level drag <br /> the scarified material to low spots. The Contractor shall fill any <br /> remaining low spots with new Gail Materials "Pro Gold with Stabilizer" <br /> brick dust from stock and make level. <br /> Note; Staff shall identify areas to scarify/cut and level drag at <br /> the November meeting with contractor's owner (as per <br /> section 6.3 of conhact). <br /> 10.1.2 Contractor shall verify all base distances, pitching rubber distances and <br /> pitching mound heights per the Li#tle League, Pony/Colt League <br /> specifications for each specific field. Contractor shall repair any <br /> specifcations not being met on any field. <br /> 10.1.3 In addition, contractor shall install 1/2" new Gaii Materials "Pro-gold <br /> with Stabilizer" (brick dust) to in-fields at all diamonds {minimum 26 <br /> tons per Girls Softball/Major Little League Field and minimum 40 tons <br /> per Junior/Senior Little League Field). Also, the contractor shall install a <br /> minimum of 1 ton of Turface calcite clay per Girls Softball/Major Little <br /> League Field and 2 tons of Turface calcite clay to Junior/Senior Little <br /> League Fields Responsibility for and purchase of necessary materials <br /> shall be at contractor's expense. <br /> Note: The City has the right to move brick dust and Turface <br /> materials to other infields under this agreement should <br /> they decide that an infield or infields do not require <br /> additional materials a particular year. <br /> <br /> 11.0 Work To Be Completed "AS DIRECTED" <br /> 11.1 Replace Base ANCHORS as directed. (This will be considered extra work.) <br /> Note: City of Santa Ana use's the Hollywood base anchoring <br /> system. Contractor shall install base anchors into the <br /> ground per manufacturer's standards. Top of stake shall <br /> be approximately 2" below the surface grade so that the <br /> base sits level and flush against the surface on all sides. <br /> 11.2 Replace Bases as directed. {This will be considered extra work.) <br /> Note: City of Santa Ana shall be responsible for supplying all <br /> necessary base anchors andlor bases to the contractor as <br /> needed. <br /> 11.3 Replace or Remove/LevellRe-Install home plates as directed. <br /> 11,4 Replace or Remove/LeveURe-Install pitching rubbers as directed. <br /> 25C-117 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.