My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - LANDSCAPE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
02/16/2010
>
25C - LANDSCAPE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:11:30 PM
Creation date
2/9/2010 8:45:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
2/16/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and broadleaf plants once per month in the Santiago Park Day Camp <br /> (Nature Reserve) meadow area. <br /> b) Edging and Detailine <br /> All edging shall be performed with the use of a McClain's edger or approved <br /> substitute. Stick edgers are not allowed. Cont~•actor shall edge alI turf adjacent <br /> to all improved hard surfaces such as concrete, decomposed granite, asphalted <br /> concrete paved areas. Edging/detailing shall be performed at the same time <br /> mowing occurs. Chemical detailing of turf may occur with the Director's <br /> approval. if chemical detailing is performed, the Contractor shall use the string <br /> trimmer to remove the treated turf within one (1) week after symptoms of <br /> phytotoxicity become recognizable. <br /> {1) The Contractor shall use the McClain's edger to edge straight lines along <br /> fences, walls, or long flowing arcs. The Director's Representative may <br /> require the Contractor to use st~•ing lines to edge straight lines if the <br /> Contractor's staff fails to achieve this quality without this method. <br /> (2} The Contractor shall detail around trees, along walls/fences and other <br /> park amenities first using a sharpened shovel cut to establish a concentric <br /> round circle around trees, poles, etc. Once the initial detailed circle is <br /> established a string trimmer may be used to maintain the circle. Should <br /> the circle begin to deform the Director shall direct the Contractor to <br /> repeat the detail process. <br /> {3} The Contractor shall detail turf not greater than 10" away from walls or <br /> fences. Detail lines shall be made straight and shall be maintained <br /> shaight. The Contractor shall, at his own cost, supply top soil and an <br /> approved turf seed to reduce any existing bare soil areas along <br /> walls/fences that are greater than 10". <br /> <br /> c) Soil Testing Amending/Top Dressing <br /> Contractor shall test the priority turf soil once per year in January by a soil- <br /> testing laboratory approved by the Directoz•. One soil sample shall be taken at <br /> each ball diamond or soccer/football field and one every 5 acres of additional <br /> turf area. The Contractor shall take the samples to a soil and plant lab approved <br /> of by the Director. The test will be comprehensive and provide a written report <br /> on the condition of the soil as well as recommendations of how to improve the <br /> soil, soil fertility, and overall health of the turf. After review of the soil reports, <br /> the Contractor shall within 60 days, and at no extra cost to the City, perform the <br /> work recommended by the soil and plant lab to improve soil health and fertility. <br /> Contractor shall mix all soil amendments, at the rates recommended by the soil- <br /> testing laboratory, with the Aguinaga "Santa Ana Top Dressing Mix" and apply <br /> the amendments and top dress mix. The Director shall verify and approve all f <br /> soil amendment type, manufacturer, quantities prior to being applied. The cap <br /> for amendments and materials shall be $50,000 per year per district, excluding <br /> 25C-20 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.