Laserfiche WebLink
labor and equipment. This cap applies to any turf, causal or priority that the <br /> City asks to be amended. <br /> d) Fertilization <br /> (I} Casual Turf -Contractor shall apply fertilizer four {4) times per year at a <br /> rate specified in the City's Agronomic Plan (see Attachment 3) with <br /> Nitra King 19-4-4 during fall-winter and Lesco 39-Q-~ during spring- <br /> summer months. <br /> (2} Sport Turf/Priority -Contractor shall apply fertilizer seven {7) times per <br /> year per the City's Agronomic Plan" (see Attachment 3) using a <br /> complete or approved fertilizer. The rate of application shall be at a rate <br /> specified in the City's Agronomic Plan. The Director may request proof <br /> of fertilizer application in the form of empty fertilizer bags. <br /> <br /> e) Irrigation-all turf <br /> (1) Contractor shall ensure irrigation schedules are constantly monitored #o <br /> provide adequate moisture in the soil for healthy turf, and avoid excess <br /> wet conditions. <br /> (2) Contractor shall not schedule irrigation of sports fields at least 24 hours <br /> prior to the mowing process. During cooler periods of the year avoid <br /> irriga#ing 48 hours prior to the mow procedures to ensure a quality cut of <br /> the turf. <br /> (3} Under noz•mal conditions the contractor shall not schedule irrigation on <br /> Friday and Saturday nights to avoid wet conditions during weekend <br /> usage. Prior approval will be required to irrigate during weekends to <br /> coordinate with reservations. <br /> {4) Turf areas shall be watered as required by weather conditions to provide <br /> adequate moisture for optimum growth. At no time shall turf areas show <br /> a lack of green color or a loss of resilience due to Lack of water. If <br /> Contractor estimates additional water above and beyond the monthly <br /> Estimated Applied Water (EAW} may be needed, he/she shall request <br /> approval from the Park Service's Utility Coordinator prior to exceeding <br /> the monthly irrigation budget as detailed in the Monthly Water <br /> Conservation Report Estimated Applied Water (EAW} requirements (see <br /> Attachment S}. Failure to get approval from the Park Service's Utility <br /> Coordinator prior to exceeding the monthly irrigation budget will result <br /> in the Contractor to pay for the excess water. <br /> (S) When an irrigation system does not adequately provide water to the turf <br /> area in which it is installed, due to any reason including but not limited <br /> to controller failure, valve failure, broken heads, poor system design, <br /> etc., the Contractor shall provide supplemental irrigation at no extra cost ~ <br /> 25C-21 <br /> <br />