My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - LANDSCAPE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
02/16/2010
>
25C - LANDSCAPE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:11:30 PM
Creation date
2/9/2010 8:45:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
2/16/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement. In the event the existing irrigation system fails to provide full <br /> and proper coverage, the Contractor shall provide alternate irrigation with <br /> full and proper coverage to all areas in the work site at no extra cost to the <br /> City. <br /> (2) Newly planted trees, slu ubs, ground cover and turf shall receive adequate <br /> water to promote normal healthy growth. Proper berms or basins shall be <br /> maintained during plant establishment period. <br /> b) Operation of Automatic Irrigation Controllers <br /> Where the operation of automatic irrigation controllers is required, the <br /> Contractor shall: <br /> (1) Not duplicate any coded City key furnished by the Parks, Recreation & <br /> Community Services Agency for access and operation of the contzoller. <br /> (2} Surrender all keys furnished by the Parks, Recreation & Community <br /> Services Agency at the end of the contract period or at any time deemed <br /> necessary by the Director to prevent serious loss to the City of Santa Ana• <br /> {3} Protect the security of City property by keeping controller cabinet and <br /> building doors locked at all times. <br /> (4) Refiain from using locked premises for stozage of materials, supplies or <br /> tools, except as approved by the Director. <br /> (5) Program normal irrigation between the hours of 10:00 p.m. and 4:00 a.m. <br /> c) Water Consezvation <br /> (1) The Contractors Certified Irrigation Specialist shall meet once a month <br /> with the Utility Coordinator to review the City's Monthly Water <br /> Conservation Report (see Attachment 5) to discuss water Consezvation <br /> strategies. These discussions may include, but not be limited to, the <br /> Contractor turning off irrigation systems during periods of rainfall and <br /> times when suspension of irrigation is desirable to conserve water while <br /> remaining within the guidelines of the EAW. <br /> {2) When the Utility Coordinator determines that plant material {turf, <br /> groundcover, shrubs, and trees) must be irrigated, all controllers shall be <br /> activated within twenty-four (24} hours. In the event the controllers are <br /> not activated within 24 hours the City may charge Contractor all staff cost <br /> incurred by City to activate controllers. <br /> <br /> d) Inspection and Reporting <br /> (1) The Contractor shall physically inspect the operation of all irrigation <br /> systems once a month and prepare a written report specifying park name, <br /> 25C-29 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.