| controller  location/name,  start  times,  run  times,  program  name,  station
<br />			 	number,  and  repairs  needed.   	The  Contractor  shall  maintain  all  sprinkler
<br />			  	systems  using  City  standard  irrigation  products  and  details.   	All  repau•s
<br />			 	shall be to City specifications and details.  Repairs to irrigation heads shall
<br />			 	be  with  matching  precipitation  nozzles.    	Contractor  shall  ensure  that
<br />			 	excessive  aver  spray/runoff  into  street  right-of--ways  or  other  areas  not
<br />			 	intended to  receive irrigation is  controlled.   	The  Contractor  shall repair  at
<br />			 	his own expense any irrigation head and lateral line rendered inoperable or
<br />			 	malfunctioning due to attrition vandalism, etc.
<br />		  	(2)   	Contractor shall perform a visual  inspection of all irrigated areas  once per
<br />			 	week.   	All  areas  receiving  marginal  coverage  shall  receive  supplemental
<br />			 	irrigation  by  being  irrigated  by  a  portable  irrigation  method.    	The
<br />			 	contractor   	shall   	furnish  all  portable  hoses,   	nozzles,   	sprinklers,   	etc.,
<br />			 	necessary to accomplish this additional irrigation.   	Care shall be exercised
<br />			 	to  prevent  a  waste  of  water,  erosion,  and/or  detrimental  seepage  into
<br />			 	existing underground improvements or structures.
<br />		e)     	Repairs
<br />		 	The  Contractor  shall  be  responsible  far  repairs  to  all  irrigation  heads,  swing
<br />		 	joints  and  lateral  lines  as  a  part  of  this  agreement.    	The  Director  will  be
<br />		 	responsible for repairs to the irrigation system from the valve to the water meter.
<br />
<br /> 9.     	Hardscape Maintenance
<br />	 	a)     	All  paved  areas,  including  but  not  limited  to  paved  parking  lots,  curb  gutters,
<br />		 	pool  decks,  stamped  or  other  enriched  hard  surface  areas,  shall  be  thoroughly
<br />		 	cleaned  once  a  week  between  Monday  and  Friday.    	Vacuums,  blowexs,
<br />		 	sweepers  or  other  approved  equipment  may  be  used  to  clean hardscape  areas.
<br />		 	Debris shall not be blown or swept onto adjacent streets or property.  All debris
<br />		 	must  be  picked  up  by  the  Contractor  and  removed  fiom  the  site.   	Debris  and
<br />		 	litter that shall be cleaned includes, but is not limited to, leaves, twigs, branches,
<br />		 	trash,  sand gravel, and worn asphalt. The City shall approve any equipment that
<br />		 	is to be used for cleaning hardscape.
<br />		b)     	Picnic  facilities  and  park  benches,  including  but  not  limited  to  picnic  tables,
<br />		 	barbecues, benches, concrete pads and shelters shall be continuously maintained
<br />		 	in a safe and clean condition.
<br />		c)    	Pavement  cleaning  -Contractor  shall  perform  pressure  washing  monthly  to
<br />		 	remove  dirt,  stains,  gum,  tar,  etc.  from  all  paved  pedestrian  surfaces  including
<br />		 	sport  courts,  sidewalks,  picnic  pads,  paved  areas  around  buildings,  pedestrian
<br />		 	crosswalks in streets that are concrete or pavers, etc.
<br />		d)    	Site  amenity  cleaning  -Contractor  shall  perform  pressure  washing  of  site
<br />		 	amenities,  such  as  but  not  limited  to,  picnic  tables,  park  benches,  skate  park,
<br />		 	walls,  planters,  raised  curbing,  railing,  exterior of buildings,  overhead  shelters,
<br />		 	etc.
<br />							25C-30
<br />
<br /> |