My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - LANDSCAPE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
02/16/2010
>
25C - LANDSCAPE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:11:30 PM
Creation date
2/9/2010 8:45:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
2/16/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b.0 Meetings <br /> b.1 Contractor shall provide City of Santa Ana staff. with a contact person and a phone <br /> number to reach the contact person from the hours of 6:30am - S:OOpm, Monday - <br /> Saturday. <br /> 6.2 Contractor shall appoint and identify to City of Santa Ana staff a "site supervisor". This <br /> site supervisor shall meet with staff one (1) time per week at a time and place agreed <br /> upon by both patties for as long as the contract is in effect to discuss any <br /> problems/concerns that may arise and any goals for the day/week. <br /> 6.3 In November of each year for as long as the contract is in effect, Contractor shall <br /> personally meet with staff, along with the designated site supervisoz•, to discuss and <br /> outline schedules for "Annual Renovations" (listed in Section 10.0). <br /> <br /> 7.0 Daily Infield Maintenance <br /> 7.1 General <br /> 7.1.I Contractor shall remove all litter, broken glass and hazardous debris <br /> from infield and dugout areas. <br /> 7.1.2 Contractor shall keep brickdust and dugout areas in a weed free <br /> condition. <br /> 7.1.3 Contractor shall hose and/or sweep and hose out all dugouts so they are <br /> 100% free of brickdust or any other debris. <br /> 7.2 Maintenance Procedure <br /> 7.2.1 Retain smooth and level playing surface, using the following daily <br /> procedure. The contractor shall remove all bases before beginning any <br /> work on in-field and re-install after all work on in-field is completed. <br /> 7.2.2 After removing all bases, the contractor shall scrape/wire brush all base <br /> post anchors and base inserts. This will help facilitate the base removal <br /> and installation. <br /> 7.2.3 The Contractor shall rake/shovel loose material from high spots back <br /> into low spots/worn areas on running paths, sliding zones, and any other <br /> low spots/worn areas appearing on the field before any watering or <br /> dragging shall take place <br /> 7.3 Home Plate Area/Batters Box Area Holes <br /> 7.3.1 Sweep/Rake away all loose brickdust. <br /> 7.3.2 Wet area until moist. <br /> 25C-40 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.