My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - LANDSCAPE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
02/16/2010
>
25C - LANDSCAPE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:11:30 PM
Creation date
2/9/2010 8:45:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
2/16/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sodding with approved seed or sod until a thick healthy stand of tuz•f is <br /> established. <br /> (4} Contractor also understands and accepts that Santa Ana is a very heavily <br /> used park system, including increased foot traffic, athletic play, and <br /> other uses. <br /> g) Aeration <br /> The Contractor shall aerate all turf areas, casual and sport/priority turf four (4} <br /> times per year in March, June, September, and December. An aerator that will <br /> remove soil plugs and deposit the cores on the surface of the turf shall perform <br /> aeration. Cores shall be pulled to a depth of b"• <br /> i) Sport/Priority Turf Renovation <br /> (1) Once (1} per year during the spring/summer or the falUwinter (as <br /> determined by the Director} the Contractor shall renovate sport/priority <br /> turf using; <br /> (a) spring/summer - LaPrima XD seed at six {6) pounds per <br /> 1,000 square feet in baz•e areas and four {4) pounds per 1,000 <br /> square feet where turf exists; <br /> (b) falUwinter -Stover Seed Company Grand Slam see at eight <br /> (8}pounds per 1,000 square feet <br /> This shall be accomplished by mowing the existing turf dawn to 1/" <br /> followed by verticutting (straight blades) to remove thatch. Prior to <br /> seeding the contractor shall have the irrigation system functioning <br /> properly and have a plan to provide supplemental irrigation as necessary <br /> to germinate the seed to 100%. The field shall be top dressed prior to <br /> seeding to provide a 100% flat playing surface. <br /> (2) Once per month after the initial seeding process is completed the <br /> Contractor shall overseed with at a rate of one (1} pound per 1,000 <br /> square feet by mowing the existing turf down to 3/4" followed by <br /> verticutting (straight blades) to remove thatch. <br /> (3) The Conhactor shall guarantee uniform germination/100% coverage free <br /> of non-germinated areas within three (3) months from the time the first <br /> application of seed or will sod any thin or bare areas with Pacific Sod <br /> Greg Norman 1 Hybrid Bermuda sod or Pacific Sod Greg Norman 1 <br /> Hybrid Bermuda Sod that has been "cropped over" with perennial lye <br /> grass. Director shall determine sod based on availability/season. <br /> <br /> 2. Ground Cover Care <br /> a) Ed ing and Detailing <br /> (1) Ground cover beds shall be maintained within their intended bounds and <br /> edged and/or detailed the first week of every month to keep the beds <br /> looking manicured at all times. <br /> 25C-98 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.