Laserfiche WebLink
(2) Ground cover shall not encroach into lawns, sluubs, adjacent desirable <br /> bare areas, curbs, wall f xtures, furniture, beneath and/or into other <br /> plants, etc. All sites shall be cleaned following each edging/detailing, <br /> including streets. <br /> b} Mulching of Bare Areas <br /> In all groundcover areas where bare soil is visible or where the groundcover is <br /> thin so the soil is visible, the Contractor shall apply Aguinaga Black Forest <br /> Floor Mulch or approved equal, size 0" to 1 %Z", %z" thick minimum every other <br /> month starting in January during the third week as necessary to maintain <br /> uniform and complete coverage. Mulch is to be maintained within its <br /> boundaries. <br /> c) Fertilization <br /> The Contractor shall fertilize all groundcover areas four (4) times per year in <br /> March, June, September, and December at two (2) pounds of actual nitrogen per <br /> 1,000 square feet using a slow release fertilizer using JTM Nutrients Complete <br /> 8-2-4 soil conditioner plus NPK slow release fertilizer at a rate of eight (8} <br /> pounds of actual nitrogen per 1,000 per square feet. <br /> d) Re lantin~ -Premium Plant Material <br /> The Contractor shall plant each year, in any area determined by the Director, 2" <br /> plugs of premium plant species at appropriate spacing so as to achieve complete <br /> coverage once the plant is 2/3rds mature. The Contractor shall be responsible for <br /> the complete removal and replacement of plants lost due to normal attrition or <br /> due to Contractor's failure to perform under the terms of this Agreement. City <br /> is responsible for cost of replacing plants lost to vandalism; however, Contractor <br /> must prove that it was vandalism that killed the plant. See Attachment 6 for <br /> plant cap. <br /> e} Re lantin~ ---Standard Plant Material <br /> The Contractor shall plant each year, in any area determined by the Director, 64 <br /> count flats of standard plant species at a appropriate spacing so as to achieve <br /> complete coverage once the plant is 2/3rds mature. The Contractor shall also be <br /> responsible fox the complete removal and replacement of plants lost due to <br /> normal attrition or due to Contractor's failure to perform under the teams of this <br /> Agreement. City is responsible for cost of replacing plants lost to vandalism; <br /> however, Contractor must prove that it was vandalism that killed the plant. See <br /> Attachment 6 for plant cap. <br /> <br /> 3. Shrub Care <br /> a) Pruning/trimmin~ <br /> 25C-99 <br /> <br />