Laserfiche WebLink
iNSURANGE NG7 REQUIt~EI~ A-2009-202 <br />WORK MAY FROGL:EO <br />CLERK OF COU~1C1'. p~ <br />~a-r~ (-Zg- l0 ~4~~ <br />~~ AGREEMENT BETWEEN CITY OF SANTA ANA AND CITY OF IRVINE <br />FOR THE DYER ROAD/BARRANCA PARKWAY/RED HILL AVENUE <br />INTERSECTION IMPROVEMENT PROJECT <br />THIS DESIGN AND CONSTRUCTION AGREEMENT ("Agreement"), is made and <br />entered into this~~`day of ~axnua~ , 2010 by and between the CITY OF SANTA ANA, a <br />California charter city ("Santa Ana" , and the CITY OF IRVINE, a California charter city <br />("Irvine"). In this Agreement, Santa Ana and Irvine may each be individually refereed to as a <br />"Party" and collectively referred to as the "Parties." <br />~ RECITALS: <br />~_..,~ <br />~"~ WHEREAS, Irvine has initiated and is proceeding with the Dyer Road/Barranca <br />s~ , Parkway/Red Hill Avenue Intersection Improvement Project ("Project"), which includes the <br />`~ design and construction of additional through lanes in each direction along Dyer Road/Barranca <br />(`l1 ~ Parkway and Red Hill Avenue, the addition of eastbound and westbound left-turn lanes on <br />Barranca Parkway, and the addition of a westbound dedicated right-turn lane on Barranca <br />`~ ~. Parkway and Red Hill Avenue; and <br />WHEREAS, the Project involves Santa Ana and Irvine because the common city <br />boundary line exists through the intersection of the Project; and <br />WHEREAS, some of the Project includes work within Santa Ana; <br />NOW, THEREFORE, based upon the foregoing Recitals, and for good and valuable <br />consideration, the receipt and sufficiency of which is acknowledged by all Parties, the Parties <br />agree as follows: <br />In accordance with the existing Agreement dated November 24, 1992 and Letter of <br />Understanding dated January 6, 2006 between Santa Ana and Irvine, Irvine will act as <br />lead agency for the design and construction phases of the Project. Irvine is responsible <br />for funding the Project within the Santa Ana and Irvine city limits. Pursuant to the <br />agreement, Irvine is responsible for "Total Cost" of the project. Total Cost includes the <br />design, design administration, materials testing, site construction survey, inspection, <br />construction engineering, construction management, as well as construction for the <br />entire Project at no cost to Santa Ana. <br />2. Santa Ana will review, approve and sign the final design drawings for the <br />improvements within the City limits of Santa Ana prior to bid advertisement. <br />Santa Ana will issue a no fee permit and inspect the improvements for general <br />conformity to the plans and city standards within Santa Ana. <br />4. Santa Ana will coordinate the relocation of all affected utility company facilities <br />within the City limits of Santa Ana in a timely manner. <br />