c� <br />An employee -owned company <br />December 9, 2009 <br />Mr. Kenny Nguyen, PE <br />Senior Civil Engineer <br />City of Santa Ana <br />20 Civic Center Plaza, M -36 <br />Santa Ana, California 92702 <br />EXHIBIT A -2 <br />SCOPE OF SERVICES <br />Subject: SR -55 /MacArthur Boulevard Interchange Ramp Widening Project <br />Contract Amendment #2 (revised) <br />Dear Mr. Nguyen: <br />PBS &J appreciates the opportunity to submit this revised proposal agreement to the City of Santa <br />Ana for approval of additional work necessary to update the SR -55 /MacArthur Boulevard <br />Interchange Ramp Widening Project (EA OH2900). <br />The purpose of the additional work effort is to include widening required on MacArthur Boulevard <br />to adequately address the existing traffic operational issues. The original scope of work included <br />widening the eastbound on -ramps with only restriping MacArthur Boulevard per attachment "A" <br />per the City's RFP in 2007. <br />The original scope of services only included restriping of MacArthur Boulevard; however, our <br />detailed technical analysis determined that the existing width of MacArthur Boulevard is not wide <br />enough to accommodate four general purpose traffic lanes with both left and right shoulders as <br />required by Caltrans. This will require PBS &J to include additional plan sheets and details in the <br />construction documents that were not originally included in the scope of work. Due to the previous <br />work efforts put forth for this project the current budget is not sufficient to complete the project <br />with the additional work required to add the roadway widening on MacArthur Boulevard to the <br />plans, specifications and cost estimate. Therefore, PBS &J is requesting a contract amendment in the <br />amount of $45,000, $35,000 for PBS &J's effort and $10,000 for additional survey on MacArthur <br />Boulevard by Towill. <br />Per our ongoing discussions our request for additional fee is based on the following assumptions: <br />• A full hydraulic /hydrology report is not necessary for this project. Basic calculations with new <br />tributary areas and a memo indicating that water is not backing up to Caltrans right -of -way is <br />sufficient. <br />• The drainage and contour grading plan sheets will be combined. <br />• Utilities will be shown on the layout sheets to eliminate separate utility sheets. <br />• The signing and pavement delineation sheets will be combined. <br />• Water pollution control plan sheets will not be required. However, the water pollution control <br />items of work must be in the Caltrans Special Provisions, in the Summary of Quantities plan <br />sheets and in the project cost estimate. The Caltrans Standard Plans will provide the plan sheet <br />information. <br />625 The City Drive South • Suite 200 . Orange, California 92868 • Telephone: 714.750.7275 • Fax: 714.750.2501 • www.pbsj.com <br />