Laserfiche WebLink
Proposal for San Lorenzo Lift Station EIR <br />Prepared for: CITY OF SANTA ANA <br />EXHIBIT B: SCOPE OF WORK <br />with appropriate information and data as necessary to ensure that the project is adequately evaluated <br />for significance as required by CEQA. <br />Once the draft technical studies are completed, T &B Planning will review all reports for completeness, <br />consistency, and CEQA adequacy before they are submitted to the City for review. Each of the <br />technical reports will adhere to City of Santa Ana requirements. They will disclose existing <br />conditions, include an impact analysis (for direct, indirect, and/or cumulative impacts for the <br />project's construction and operational phases, as warranted), and identify project design features <br />and/or mitigation measures that reduce or avoid impacts. All conclusions contained in the reports <br />will be supported by verifiable facts documented in the reports or properly referenced. <br />The budget for this task includes T &B Planning's role in managing the technical experts and reviewing <br />their work for adequacy. Based on our understanding of the project, we assume the technical reports <br />listed here and described below will be necessary in support of the required EIR: (1) traffic; (2) <br />noise; and (3) air quality and global climate change. <br />Task 3.2 - Traffic Impact Analysis <br />In support of the proposed project, Urban Crossroads, Inc. will prepare a traffic impact analysis for <br />the project, which will focus on the project's near -term construction - related impacts. As part of this <br />task, Urban Crossroads shall conduct the following work efforts in support of the project: <br />Scoping <br />1. Urban Crossroads, Inc. will attend up to one (1) meeting with the project team and/or <br />City of Santa Ana staff to review the project and to identify project assumptions. <br />Traffic Control Plan <br />2. Provide traffic control plans in conjunction with the construction of the San Lorenzo lift <br />station. The traffic control plans will be prepared using AutoCAD at a scale of V = 40' <br />on a single sheet (1) and show approximately 2,400 lineal feet on each sheet for the <br />shoulder/lane closures expected to be needed. Additional sheets are considered extra <br />work effort and may require an amendment. <br />3. Respond to plan check comments /questions and revise plans as necessary (to a maximum <br />total of three submittals). <br />Traffic Impact Study <br />4. Review the City of Santa Ana's draft contract documents specifying construction- related <br />requirements and the City's traffic control requirements. <br />5. Conduct peak hour intersection turning movement counts, at up to three (3) existing <br />intersection locations. <br />6. Conduct 24 -hour roadway segment counts, for up to two (2) segments. <br />7. Conduct a field inventory of intersection traffic control measures, approach lanes at <br />intersections, and through travel lanes along study area segments. <br />Page B -3 <br />