Laserfiche WebLink
<br />Rehabilitation Projects Receiving> $25,000 (Rehabilitation Hard Cost) <br />· Must have a risk assessment or presume the presence of lead-based paint. <br />· Must abate all lead hazards. <br />· Must use certified workers <br />· Must follow HUD's safe work practices <br />· Must obtain clearance <br /> <br /> <br />· Latex (exterior & interior) <br /> <br />Preparation <br />· All surfaces to be painted shall be properly shall be properly prepared. <br />· Wood surfaces shall be clean and all loose and peeling paint shall be removed. Remaining paint <br />edges shall be feather sanded. <br />· All loose and scaling stucco shall be removed. <br />· Holes and cracks shall be filled with an appropriate material and finished so that they blend into <br />the surrounding area. <br />· Damaged and deteriorated window glazing putty shall be replaced with new putty. <br />· All joints shall be caulked. <br />· Raw (exposed) wood and metal shall be properly primed <br />Painting <br />· All exterior wood surfaces shall receive a complete and even coverage of high-quality exterior- <br />grade latex paint. <br />· All exterior stucco surfaces shall receive a complete and even coverage of high-quality exterior- <br />grade stucco paint. <br />· All interior walls shall receive a complete and even coverage of interior-grade latex paint. Use <br />satin or semi-gloss on doors, trim and in kitchens and bathrooms. <br />· Shoddy workmanship will not be accepted. <br /> <br /> <br />R COVER,ING <br /> <br /> <br />Carpet & Pad <br />Carpet that is damaged or deteriorated beyond feasible repair shall be replaced. Carpet that is <br />unsanitary and cannot be satisfactorily cleaned shall be replaced. Replace aged carpet that has five or <br />less years of practical utility. <br /> <br />New Carpet & Pad <br />· Reputable manufacturer <br />· 1/2. thick, 6.5 re-bond pad <br />· Nylon, olefin, polyester, recycled materials <br />or blend <br /> <br />· Density of 2000 <br />· Twist rating of 5 <br /> <br />· All surfaces shall be clean, smooth and structurally sound. <br />· Carpeting shall be installed using a minimal number of pieces. <br />· All transition areas shall be properly secured and edges tacked. <br />· All seams shall be hot taped and virtually invisible. <br /> <br />Page 2 of 8 <br />