Laserfiche WebLink
be knowledgeable in tree pruning and tree care prior to the commencement of any and all <br />work. <br />2.01 STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION <br />The current edition of the "Green Book", Standard Specifications for Public Works <br />Construction and it's updates, supplements and local addendums, shall be included as part <br />of these specifications, unless otherwise directed in these specifications. <br />2.02 SPECIFICATIONS INTERPRETATION <br />The intent of these specifications is known by the City of Santa Ana and SAPRF. Any <br />questions relating to the interpretation of these specifications must be addressed, in <br />writing, prior to the start of work. The Contractor agrees that interpretations of this <br />contract after the start of work are at the SAPRF sole discretion, and the Contractor shall <br />abide by all such interpretations. <br />2.03 EXTRA WORK <br />In the event the Contractor is required by the City to perform extra work, the following <br />procedure shall govern such work: <br />a. When required, by the SAPRF representative, an itemized estimate of cost will be <br />submitted for approval prior to work being performed. The Contractor shall maintain <br />records sufficient to distinguish the difference between direct cost and extra work. <br />He shall furnish reports of extra work on forms, agreed upon and approved by the <br />SAPRF representative, itemizing all costs for labor, materials and equipment rental. <br />The report shall include hours worked and be in accordance with the following <br />conditions: <br />1. Work will be executed under the direction of the SAPRF on a time and <br />material basis or an agreed lump sum price depending on the nature of the <br />work. <br />2. The SAPRF representative will issue a work request for such extra work to be <br />performed. <br />3. Extra work will not be initiated without written authorization, except in <br />emergency call -out situations. The SAPRF representative will solely define <br />specific emergency situations. <br />4. Extra work may include, but is not limited to, the following: <br />a). Repairs to landscaping, sprinkler systems, and/or facilities, unless <br />damaged by Contractor. <br />10 <br />