My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPES
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
M-N (INACTIVE)
>
MARIPOSA LANDSCAPES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 12:55:40 PM
Creation date
4/23/2010 10:49:12 AM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPES
Contract #
A-2010-028
Agency
Parks, Recreation, & Community Services
Council Approval Date
2/16/2010
Expiration Date
3/21/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.04 PROTECTION OF EXISTING FACILITIES AND STRUCTURES <br />The Contractor shall exercise due care in protecting from damage all existing facilities, <br />structures, and utilities, both above surface and underground on the City's property. Any <br />damage to City, SAPRF, or private property caused by the Contractor's neglect shall be <br />corrected and paid for by the Contractor at no cost to the City of Santa Ana or SAPRF. <br />The City of Santa Ana and/or SAPRF shall make the determination of fault. The SAPRF <br />representative reserves the right to issue a Stop Work Notice if the Contractor does not <br />promptly repair any damage, within twenty-four (24) hours of the damage incurred. <br />If the SAPRF representative requests or directs the Contractor to perform work in a given <br />area, it will be the Contractor's responsibility to verify and locate any underground <br />systems (i.e. utility lines) and take responsibility for taking reasonable precaution when <br />working in these areas. <br />Contractor shall call Underground Alert (800) 422-4133) at least two working days prior <br />to digging for line locations. Any damage or problems shall be reported immediately to <br />the SAPRF representative and the City of Santa Ana. If the Contractor discovers <br />something unexpected or a unique problem occurs, he should stop work and immediately <br />contact an authorized SAPRF representative for a timely resolution of the problem. <br />2.05 CONTRACTOR'S STAFF <br />The Contractor shall provide sufficient personnel to perform all work in accordance with <br />the specifications set forth herein. A qualified, English speaking supervisor in the <br />employ of the Contractor shall supervise all of the Contractor's personnel. The <br />supervisor shall be available at all times to the SAPRF representative during work <br />operations. The responsibility for all work performed will remain with the full-time <br />certified arborist. <br />The Contractor shall furnish the necessary competent and key personnel to properly <br />supervise and direct the work of fully equipped, competent and experienced crews as well <br />as all safety equipment, including but not limited to, all equipment and work procedures <br />required by ANSI Z133.1-1994. The Contractor shall secure all timekeeping, <br />bookkeeping and other necessary clerical and office work required in the performance of <br />the contract. <br />The Contractor shall be responsible for the supervision of all of his crews. He shall <br />check all of his crews regularly for proper quantity and quality of work, proper <br />maintenance of tools and equipment, and safety. <br />2.06 SUBSTITUTIONS <br />Whenever a specific type of material is specified, no substitutions shall be allowed <br />without written consent of the SAPRF representative. <br />2.07 CERTIFICATION OF MATERIALS <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.