My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPES
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
M-N (INACTIVE)
>
MARIPOSA LANDSCAPES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 12:55:40 PM
Creation date
4/23/2010 10:49:12 AM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPES
Contract #
A-2010-028
Agency
Parks, Recreation, & Community Services
Council Approval Date
2/16/2010
Expiration Date
3/21/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All materials shall be delivered on the site in original containers. Materials shall be <br />subject to inspection by the ARMD representative. The SAPRF representative will not <br />approve materials not meeting the SAPRF standards, and Contractor shall return any such <br />non -satisfactory items at his/her cost. <br />2.08 CONTRACTOR NEGLECT <br />Any damage to the City of Santa Ana, SAPRF, or private property, which has been <br />determined to be due to the Contractor's neglect, shall be corrected at no additional cost <br />to the City of Santa Ana or the SAPRF. <br />2.09 HOURS OF OPERATION <br />The Contractor shall perform all work between the hours of 7:00 a.m. and 4:00 p.m., <br />Monday through Friday. No work shall be performed on weekends or on City recognized <br />holidays without written SAPRF approval. <br />2.10 SPECIFICATIONS AND PLANS <br />The work performed shall be done in accordance with the Standard Specifications for <br />Public Works Construction, latest edition, hereinafter referred to as Standard <br />Specifications. In case of conflict between the Standard Specifications and this <br />Specification, this Specification shall take precedence over and be used in lieu of such <br />conflicting portions. <br />Where the plans or specifications describe portions of work in general terms, but not <br />complete detail, it is understood that workmanship of the finest quality is to be used. <br />Unless otherwise specified, the Contractor shall furnish all labor, materials, tools, <br />equipment and incidentals and do all the work involved in executing the contract. <br />2.11 CONSTRUCTION EQUIPMENT <br />The Contractor shall take all necessary precautions for safe operation of his equipment <br />and the protection of the public from injury and damage from such equipment. <br />2.12 SOUND CONTROL REQUIREMENTS <br />The Contractor shall comply with all local sound control and noise level rules, <br />regulations and ordinances that apply to any work performed pursuant to the Contract. <br />Each internal combustion engine used for any purpose on the job or related to the job <br />shall be equipped with a muffler of a type recommended by the manufacturer of such <br />equipment. No internal combustion engine shall be operated on the project without said <br />muffler. Full compensation for conforming to the requirements of this section shall be <br />considered as included in the prices paid for the various contract items of work involved <br />and no additional compensation will be allowed therefore. Sounds, such as loud music, <br />that are not related to the project, shall be kept at levels so as to not disturb the general <br />public. <br />2.13 TRAFFIC CONTROL <br />The Contractor shall notify the SAPRF representative of intent to begin the contract work <br />at least five (5) days before work is begun. The Contractor shall cooperate with local <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.